说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小湾水电站
1.
Brief introduction to the power market and power transmission scheme for Xiaowan Hydropower Station;
小湾水电站电力市场和输电方案概述
2.
Summary on the Excavation of Tailrace Surge Chamber in Generating System of Xiaowan Hydropower Station
小湾水电站引水发电系统尾水调压室开挖综述
3.
The Optimization Study of Construction Diversion Buildings in Xiaowan Power Station;
小湾水电站施工导流建筑物优化研究
4.
Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station
小湾水电站双曲拱坝混凝土性能研究
5.
A summary of land acquisition and resettlement for the construction of Xiaowan Hydropower Station;
小湾水电站工程水库建设征地移民工作综述
6.
Quality Control of Anti-scouring and Anti-abrasion Concrete for the Water Cushion Pool of Xiaowan Hydropower Station
小湾水电站水垫塘抗冲耐磨混凝土质量控制
7.
Discussion on Construction Technology of Abrasion-resistant Concrete for Water Cushion Pond of Xiaowan Hydropower Station
小湾水电站水垫塘抗冲耐磨混凝土施工技术
8.
Summary on the Excavation Method of Underground Cavern Chamber of Xiaowan Hydropower Station
小湾水电站工程地下洞室开挖方法小结
9.
River Closure Model Test and Study for Construction of Xiaowan Hydropower Project on the Lancang River
澜沧江小湾水电站施工截流模型试验研究
10.
Surrounding Rock Stability Analysis of Xiaowan Hydropower Project Underground Powerhouse Chambers
小湾水电站地下厂房洞室群围岩稳定分析
11.
Safety monitoring of the construction of high cable foundation of arch bridge on Xiaowan left bank
小湾水电站高缆基础拱桥施工安全监测
12.
Optimizement Study of Pre-splitting Parameter in Xiaowan Dropower Station;
小湾水电站开挖中预裂爆破参数的优化研究
13.
Dynamic Response Analysis of Blasting Vibration in Xiao-Wan Side Slope Excavation;
小湾水电站边坡开挖爆破震动动力响应分析
14.
Practice of tendering & bidding method in Xiaowan Hydropower Project;
招标投标法在小湾水电站工程招标中的实践
15.
Analysis of Result on Deformation Monitoring of Xiaowan Arch Dam Foundation Rock Mass
小湾水电站坝基岩体全过程变形监测成果分析
16.
Planning, Design and Management of Kongquegou Artificial Aggregate System of Xiaowan Hydropower Station
小湾水电站孔雀沟砂石系统的规划、设计与管理
17.
Operation and Management of Cable Cranes in the Construction of Xiaowan Arch Dam
小湾水电站拱坝施工中缆机的运行管理与探索
18.
Application of Blind Hole Method and Impact Indentation Method in Residual Stress Measurement of Runner of Xiaowan Hydropower Station
盲孔法及压痕法在小湾水电站中的应用