1.
Dynamic Response Analysis of Blasting Vibration in Xiao-Wan Side Slope Excavation;
小湾水电站边坡开挖爆破震动动力响应分析
2.
Summary on the Excavation of Tailrace Surge Chamber in Generating System of Xiaowan Hydropower Station
小湾水电站引水发电系统尾水调压室开挖综述
3.
Research of Safety Control Standard for Rock Excavation Blasting in XiLuoDu Waterpower Station;
溪洛渡水电站边坡开挖爆破安全控制标准研究
4.
Study on Blasting Technology of Laxiwa Hydro-Power Station High Slope Excavation;
拉西瓦水电站高边坡开挖爆破技术研究
5.
Construction Technique of Excavating and Supporting Applied to High Side Slope in Dongqing Hydropower Station
董箐水电站高边坡开挖与支护施工技术
6.
Finite Element Simulation of Excavation and Support of Slope at Right Bank in Dagangshan Hydropower Station
大岗山水电站右岸边坡开挖支护的有限元模拟
7.
Summary on the Excavation Method of Underground Cavern Chamber of Xiaowan Hydropower Station
小湾水电站工程地下洞室开挖方法小结
8.
Optimizement Study of Pre-splitting Parameter in Xiaowan Dropower Station;
小湾水电站开挖中预裂爆破参数的优化研究
9.
RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION
坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
10.
Development of GPS Deformation Monitoring System for Steep Slopes in the Xiaowan Hydropower Station;
小湾电站高边坡GPS形变监测系统研究
11.
The excavation of the side slope of the power house for Zhikong Hydropower Station in Tibet is restricted by a narrow construction site and a limited construction period.
西藏直孔水电站边坡石方开挖具有施工场地狭小、工期要求紧的特点。
12.
A Study on Failure Model and Stability of the Plunge Pool Right Bank Slop in Xiaowan Hydraulic-Power Station;
小湾水电站水垫塘右岸边坡变形失稳模式及稳定性研究
13.
DEFORMATION-FRACTURE MECHANISM ANALYSIS AND STABILITY EVALUATION OF HIGH SLOPE FOR WATER-INTAKE OF XIAOWAN HYDROPOWER STATION
小湾水电站进水口高边坡变形机理分析及工程意义
14.
STABILITY CHECKING AND ANCHORING FORCE RESEARCH OF WATER-INTAKE SLOPE AT XIAOWAN HYDROPOWER STATION
小湾水电站进水口边坡稳定性复核及锚固力研究
15.
Systematical Study on Engineering Geology of the Excavation Slopes Stability of Nuozadu Hydro-power Station in Lancang River;
澜沧江糯扎渡水电站开挖边坡稳定性工程地质系统研究
16.
Mechanism Analysis on Deformation of Excavation Slope on the Left Bank Accumulation Body of Xiluodu Hydropower Station;
溪洛渡水电站左岸谷肩堆积体开挖边坡变形机制分析
17.
Instability Mode and Stability Analysis of the Left Bank Head an Excavated Slope of Jinping Hydropower Station;
锦屏一级水电站左岸坝头开挖边坡失稳模式及稳定性分析
18.
Study on Relief of Excavation Slope of Fossil Weathered Rock and Anchor Measure of Gongboxia Hydroelectric Powerstation;
公伯峡水电站古风化岩边坡开挖松驰与锚固措施研究