说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 沙湾电站
1)  Shawan Power Station
沙湾电站
2)  Shawan hydropower station
沙湾水电站
1.
Study on Stress and Deformation of Plastic Concrete Cutoff Wall at Deep Foundation Pit of Shawan Hydropower Station
沙湾水电站深基坑塑性混凝土防渗墙应力及变形研究
2.
Experiences in construction organization and quality control of remedial diaphragm wall for the first stage cofferdam at Shawan hydropower station in Leshan in Sichuan province are presented in this paper.
介绍了沙湾水电站一期围堰补强防渗墙的施工组织与质量控制的经验。
3.
<Abstrcat>Combining depth-averaged numerical seepage flow model and 2-dimensional profile seepage flow model, seepage rate, seepage velocity field and hydraulic gradient of seepage control work in left abutment of Shawan hydropower station have been obtained.
采用深度平均渗流模型结合2维立面渗流模型,对沙湾水电站左岸坝肩"地窗式"防渗方案进行了渗流量、渗流场及渗透坡降的计算;根据计算结果,对"地窗式"防渗方案进行了优化计算,提出了满足本工程防渗要求的阶梯型"地窗式"防渗体体型;计算结果表明沙湾水电站左岸坝肩采用阶梯型"地窗式"防渗体体型后,不仅可取消50m深防渗墙下施工繁琐的墙下帷幕灌浆3000余米,而且全封闭砼防渗墙可做成悬挂式,大大降低了防渗墙的最大深度和施工难度,还节约防渗墙900余米,其工程经济效益显著;本文方法对类似工程问题具有重要参考价值。
3)  Shawan hydropower station on Dadu River
大渡河沙湾电站
1.
Through process quality control of the plastic concrete diaphragm wall of the first stage cofferdam at Shawan hydropower station on Dadu River , some experiences are enhanced for similar projects .
通过对大渡河沙湾电站一期围堰塑性混凝土防渗墙的过程质量控制,总结并积累了对类似防渗墙施工质量控制的经验,并通过质量检查证明,所述质量控制措施和手段起到了较好的作用。
4)  Manwan hydropower station
漫湾电站
1.
Countermeasures for slope perils on the left bank in Manwan Hydropower Station;
漫湾电站左岸边坡隐患及对策
2.
Analysis of the spatial-temporal characteristics of R value in the storage areas of Manwan Hydropower Station may supply good advices to prevent soil erosion effectively in local region.
根据有关降雨侵蚀力的计算方法,利用漫湾电站库区4个测站1980~2000年的逐月平均降雨资料,估算了其降雨侵蚀力R值的时空分布规律及其变化特征。
5)  Xiaowan hydropower station
小湾电站
1.
Stability analysis of high inlet slope for Xiaowan Hydropower Station;
小湾电站进水口高边坡稳定性研究
2.
In the Feasibility Report of Xiaowan Hydropower Station,construction schedule will be much slowed down due to more orifices in the dam body,reservoir filling will start 12 years later after the construction of reservoir has begun.
小湾电站可行性报告中,坝身布置的孔口大多,影响施工速度;由于大坝施工进度慢,水库在开工后的第12年汛期才能开始拦蓄洪水。
3.
Prior to the joint grouting work of the Xiaowan hydropower station,we conduct indoor and On-site slurry performance tests which provide scheme and basis for the construction.
45:1水灰比浆液对小湾电站横缝进行接缝灌浆,取得了很好的效果。
6)  Xiaowan hydropower project
小湾电站
1.
In this paper, coupling of stress and seepage fields at the damsite area of the Xiaowan hydropower project is analyzed, and the fractal effect of rock fractured surface on the seepage flow in fractured rock masses is studied by means of numeric simulation of single fracture permeability.
本文研究了小湾电站坝址区岩体渗流场与应力场的耦合相互作用 ,并结合右坝肩F1 1 断层的特性 ,探讨了裂隙内具有不同填充物情况下 ,裂隙表面分形对裂隙渗流和应力的影响。
2.
To solve the powerhouse intake high slope stability problem for the Xiaowan Hydropower Project a further comprehensive study was made based on the results of rock mass classification, sampling of soft seams, test and analysis, shearing plane network simulation and slope stability limit analysis developed in the early stage study .
围绕小湾电站厂房进口高边坡的稳定性问题 ,利用前期研究中开发的岩体分类、软弱夹层的取样、试验和分析方法、结构面网络模拟、边坡稳定的极限分析等成果 ,在进一步发展完善的基础上进行了综合研究。
补充资料:大亚湾核电站
大亚湾核电站

    中国90年代兴建的规模最大的核电站。位于广东省大亚湾畔的大坑村。由广东核电投资有限公司和香港核电投资有限公司合资建设,1984年4月动工。电站范围198万平方米,厂区占地63.5万平方米,反应堆采用法国制造的2台900兆瓦压水堆,90 厘米厚的预应力钢筋混凝土密闭安全壳可承受 5个大气压。电站装有2套各900兆瓦的汽轮发电机组,年发电量可达 100亿千瓦时。电站投产后,70%的电力供应香港,30%供应广东。1号机组于1993年8月21日并网发电,1994年2月投入商业运行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条