1) life cycle cost
全寿命周期总费用
1.
This paper expounds the composition and calculation of life cycle cost of cable project construction and operation,analyzes the economic operation of cables,and researches into the influence of cable cross-sectional area on annual cost and the effect of the maximum load utilizing time and power rate on economic current density.
阐述了电缆线路工程建设、运行的全寿命周期总费用的构成及其计算方法,并对电缆的经济运行进行了比较和分析,讨论了电缆横截面积对年均总费用的影响,以及最大负荷利用时间和电价对经济电流密度的影响。
2) safety life
安全寿命
1.
Using the method of probability statistics,the relationship between safety life and experiment life was theoretically obtained at small-number specimen experimental conditions when the fatigue life obeys logarithmic normal distribution.
利用概率统计的方法,得出了在小样本实验条件下,当疲劳寿命服从对数正态分布时安全寿命与中值实验寿命之间的关系。
2.
As a critical part of helicopter,rotor blade anti-fatigue design technique is one of the key to improving safety life and decreasing cost.
作为直升机的关键动部件,桨叶的抗疲劳设计技术是提高桨叶安全寿命,降低桨叶使用成本的关键。
3.
The service life of dynamic components of a helicopter was decided by the safety life assessing method, but the results show that the given life was conservative, so it has capacity to prolong the life.
某型直升机采用安全寿命评定方法对其动部件进行了定寿 ,确定的使用寿命偏于保守 ,具有较大的寿命潜力。
3) safe life
安全寿命
1.
The safe life and the life diffuse factor in grouping component fatigue test are studied with the probability statistic methodology.
用概率统计方法研究了构件在成组法疲劳试验中的安全寿命和寿命分散系数 ,用单侧容限系数法计算了 1Cr18Ni9Ti材料及焊接接头的寿命分散系数 ,并对计算结果进行了讨论。
2.
During the calculating of a plane s components fatigue safe life, we make use of the reliability modulus and the believe modulus.
本文采用双参数威布尔分布,利用可靠性系数、置信系数来估算飞机结构件的疲劳安全寿命,物理意义明确,过程简单。
3.
A method for the low cycle fatigue safe life expectation design and assessment of steam turbine components is presented.
文中提出了汽轮机部件低周疲劳安全寿命的设计和评定方法。
4) total life cycle
全寿命期
1.
In this thesis, the object of risk early-warning is total life cycle of project.
将项目的全寿命期作为风险预警对象,对风险预警做出理论阐述,对风险强度做出定义,建立风险预警逻辑框架和指标体系,并对风险预警指标进行等级划分,强调预警系统的制度化建设和动态完善过程。
2.
Differing from the traditional and narrow sensed project plan, total life cycle integrated project plan must be oriented by the total life cycle objectives, and focus on the function building and operation, including design, organization plan, implement scheme, implement process plan and operation plan, etc, and it has highly systemic character with complicated interrelations among the elements.
与传统的狭义的项目计划不同 ,建设项目全寿命期综合计划必须以全寿命期项目目标为主导 ,以项目的功能建设和运行为核心 ,包括设计、组织策划、实施方案和实施过程计划、运行策划等 ,它们之间有复杂的内在联系 ,具有高度的系统
5) total life
全寿命
1.
Discuss on the application of total life analysis in pavement design;
试论全寿命分析法在路面设计中的应用
2.
The traditional approach for calculating total life s mileage of vehicle component requires making load spectrum which can reflect total life s mileage.
传统的计算车辆构件全寿命里程的方法首先要编制反映全寿命里程的载荷谱。
3.
Based on the factors, the basic ideas and methods that should notice are provided, including system research?uncertainty research?total life analysis?optimum research.
根据这些影响因素的特征,提出了桥梁健康研究应该注重的基本思路和主要方法,包括系统化研究、不确定性研究、全寿命分析、健康优化研究等。
6) Life cycle
全寿命
1.
The function and the management goal of the life cycle agile supply chain (LASC) for the big customized products are presented based on CPC(collaborative product commerce) concept.
阐述了基于CPC理念的大型定制产品全寿命供应链的功能及其管理目标。
2.
The paper firstly analyses some characteristics of SELC (the space equipment life cycle).
从航天装备全寿命期的特点入手 ,分析了全寿命期划分、费用分配关系、全寿命费用构成要素 ;研究了全寿命费用估算的方法及各自的应用范围、使用时
3.
The development of modern project management presses for integrated risk management and life cycle risk management,using systemic and dynamic measures to weigh and appraise risk thoroughly,and taking corresponding measures to control it,so as to reduce the indetermination in the process of project.
现代项目管理行业的发展迫切要求集成化风险管理和全寿命风险管理,用系统的、动态的方法对风险进行全面的衡量和评价,采取相应的措施加以控制,以减少项目过程中的不确定性。
参考词条
补充资料:寿命周期费用
寿命周期费用
life cycle cost; LCC
Sh以Jming zha门1 fel卯ng寿命周期费用(life cycle酬;比c)又称全寿命费用。产品在其整个寿命周期中的爪计费用,是产品从形成概念到被处理废弃的时间间隔内所循消耗的一切资源全部量化为金额后的总和。产品的寿命周期包括概念和定义、设计和开发、制造、安装运行和维修、处置等5个主要阶段。故寿命周期费用按定义即为概念和定义费用、设计和开发费用、制造费用、安装运行和维修费用、处置费用之和。所有发生在上述5个阶段的费用又可划分为采办费用和拥有者费用两大类,因此,寿命周期费用也等于采办费用加拥有者费用。 寿命周期费用应无遗漏,无重复地计及一切发生在产品寿命周期内的直接、间接、一次性、重复性和其他有关费用之和,而不管费用来源的渠道和管理的隶属关系。 发展过程20世纪后半叶,随着武器装备性能的改进和提高,不仅其采购费用大幅度增加,更导致其使用维修费用急剧上涨,数额可达前者的几倍。军费开支的迅速膨胀,成为美国国防部的沉重负担。于是把寿命周期费用作为专门问题于印年代开始进行系统研究,其目的在于控制军费。 美军于1971年7月颁布了《寿命周期费用评价指南)(比C一l)和(寿命周期费用估计采购案例汇编)(比C-2)。1973年1月颁布了《采办的寿命周期费用分析和估计指南》,即珑C-3。文件规范了寿命周期费用的定义、估算、分析和评价方法以及管理程序等。它的应用由美国国防部门发展到政府机关、民间产业界及很多发达国家。1987年11月国际电工委员会(IEc)颁布了《寿命周期费用评价—概念、程序及应用》标准草案,l卯8年8月,中国颁发了公田22 21)517(武器装备寿命周期费用估算》国家军用使用标准。 基本内容寿命周期费用的技术包括寿命周期费用估算、寿命周期费用分析、寿命周期费用评价和寿命周期费用管理等内容。 ①寿命周期费用估算。把产品在其寿命周期内消耗的全部资源量化为金额累加以得出总费用的过程。首先,按产品的硬件、软件和寿命周期各阶段的工作项目,将寿命周期费用逐级地分解为主费用单元,子费用单元直至可以进行计算的基本费用单元,形成倒树状的费用分解结构。此项工作称为费用分解。然后是进行费用计算,由基本费用单元开始,逐项计算费用,累加成为上一级费用单元的费用,直至算出整个寿命周期费用。寿命周期费用的估算方法有4种,应根据估算的目的、估算所处的阶段和所掌握的数据资料分别或综合采用。它们是:a.工程估算法。一种自下而上的详细估算方法。从最墓本费用单元开始,用工程的方法计算出其费用,逐级累加,得出寿命周期费用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。