2) stage constructed embankment
分级施工路堤
3) construction class
施工等级
4) construction analysis
施工分析
5) stage construction
分期施工
1.
Settlement prediction of embankments with stage construction on soft ground;
软土地基上分期施工的路堤沉降预测方法(英文)
2.
Nonlinear analysis on penstock laid on downstream surface of dams with considering softening of concrete and stage construction;
考虑混凝土软化和分期施工的坝后背管非线性分析
3.
The 3D non-linear FEM was applied to prediction of the deformation and stress of a CFRD under complicated topographic condition with emphasis on analysis of the influences of high steep slope and fluctuant topographic boundary on the deformation and stress behaviors of CFRD by stage construction.
运用三维非线性有限元法对某复杂地形条件下高面板堆石坝的应力变形进行预测,重点分析了高陡岸坡和起伏突变的地形边界对分期施工的高面板坝应力变形特性的影响。
6) sequential construction
分部施工
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条