1) section construction
分段施工
1.
Nowadays the method of section construction to build the modern long-span continuous-beam bridge develops rapidly, and the monitoring technology is applied to the construction more widely.
基于现代大跨度连续梁桥分段施工技术的快速发展,以及施工监测在桥梁建设中的重要作用,本文以天津市塘沽区临海桥工程(连接临港桥与海河大桥)为背景,研究施工中关键截面的内力和变形,解决施工中由于体系转换所引起的各种不利影响,为以后的施工监控提供了依据。
2) sectional construction
分区段施工
1.
In this paper a new sectional construction technology for precipi-tation pool of oxidized iron pieces were briefly described.
本文简要介绍了某工程2号铁皮沉淀池施工中所采用的分区段施工新技术及实施效果。
4) analysis of construction phase
施工阶段分析
1.
To solve the contradiction between time limit and input of construction equipment,based on the analysis of conventional construction methods,after optimizing conventional span-by-span cast-in-place construction methods and adjusting prestressing tendon based on the analysis of construction phase,the author intr.
为解决工期与施工设备投入的矛盾,通过对常用施工方法的分析研究,设计在传统逐孔现浇施工方法上进行优化,通过施工阶段分析调整预应力束,采用单孔支架逐孔现浇施工,在满足工期的前提下,添置尽可能少的设备完成桥梁施工。
5) cast-in-place segmental construction
现浇分段施工
6) Partial design-build delivery method
分段施工总承包
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条