1.
Strength increase of high sensitive clay under stage constructed embankment
分级施工河堤下高灵敏性黏土的强度增加
2.
Physical Prediction Research Based on Step-by-step Embankment Construction Settlement;
路堤分级施工加荷沉降物理预测方法研究
3.
Study on Rock Mass Sub-Classification in Construction Stage for Road Tunnel;
公路隧道施工阶段岩体围岩亚级分级研究
4.
Study of quantification theory of rocky surrounding rock sub-classification during construction
岩质围岩施工阶段亚级分级的数量化理论研究
5.
Analysis of construction technology with graded broken stone fill in top of subgrade for passenger dedicated line;
客运专线基床表层级配碎石填筑施工工艺分析
6.
System Research of Surrounding Rock Mass Dynamic Classification in Highway Tunnel of Construction State;
高速公路隧道施工阶段围岩动态分级系统研究
7.
Monitoring Analysis of Three Gorges Double-way and Five-step Navigation Lock
三峡双向五级船闸施工和运行监测成果分析
8.
Study of Sub Class of Rock Mass in Construction Moment Based on Theroy of Qualification;
基于数量化理论的岩质围岩施工阶段亚级分级方法研究
9.
Research on Construction Simulation and Optimization Analysis in Delivery Layout Stage of Jinping First-Level Hydropower Project;
锦屏一级水电工程分标规划阶段施工仿真与优化分析研究
10.
We had to dismiss some of the staff because higher authorities are constantly demanding streamlining.
由于上级不断施压要求精简人员, 我们只能把一部分员工辞退。
11.
Author points out that correct classification directly influences the construction and operation safety of tunnel.
指出围岩分级的正确与否直接影响着隧道施工和运营的安全。
12.
Parametric classification of environmental conditions of electric and electronic products for mobile platforms and offshore installations
GB/T13952-1992移动式平台及海上设施用电工电子产品环境条件参数分级
13.
The Surrounding Rock Rapid Classification and Geological Advanced Prediction in Construction in Liuhuangqian Expressway Tunnel;
六黄潜高速公路隧道施工中围岩快速分级及地质预报
14.
3D Nonlinear Finite Element Analysis and Construction Characteres of Bajiaohe First-Class Cfrd;
芭蕉河一级混凝土面板堆石坝三维有限元分析与施工特点
15.
Research on Surrounding Rock Classification and Monitoring Measurements on NATM Construction on Dabieshan Tunnel
大别山隧道新奥法施工的围岩分级和监控量测研究
16.
Analysis and Evaluation on Stability of Slope at Left Spandrel Groove of Jinping First Stage Hydropower Station in Construction
锦屏一级水电站左岸拱肩槽边坡施工期稳定性分析与评价
17.
On the Methods for Surrounding Rock Classification in Construction Stage of Highway Tunnels with High Geostress
高地应力公路隧道施工阶段围岩分级方法研究及应用
18.
FAILURE MODE AND STABILITY ANALYSIS OF LEFT BANK ABUTMENT HIGH SLOPE AT JINPING I HYDROPOWER STATION
锦屏I级水电站左岸坝肩边坡施工期破坏模式及稳定性分析