说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 青铜峡水电站
1.
Model Test and Investigation on Draft Tube Mid-pier Modification of the Qingtong-Gorge Hydropower Station;
青铜峡水电站尾水管中墩改造结构模型试验与计算研究
2.
Calculating Method for Monitoring Data from Hexi Guide Wall Displacement Meters in Qingtongxia Hydropower Station
青铜峡水电站河西导墙变位计监测数据计算方法
3.
The retrofitting schemes and implementation of RTU in Qingtongxia Substation
青铜峡变电站RTU改造方案及实施
4.
Design & Development of Qingtongxia Hydropwer Plant Computer Supervision Sysytem;
青铜峡水电厂计算机监控系统的设计与开发
5.
Numerical Simulation of Hydraulic Scouring of Silt in Front of Qingtongxia Reservoir Dam;
青铜峡水库坝前淤积体水力冲刷的数值模拟
6.
Sanxia hydro-power will supply electric power to Henan province after completion of construction.
三峡水电站建成后将向河南电网供电。
7.
Research on the Supply-demand Balance of Water Resources and the Water Seepage from Canal Systems in Qingtongxia Irrigation District;
青铜峡灌区水资源供需平衡及渠系渗漏研究
8.
The Sedimentation Deformation Calculation by Quasi-2D Numerical Simulation in the Qingtongxia Reservoir;
青铜峡水库泥沙冲淤变形准二维数值模拟计算
9.
Study on the water and salt balance of farming areas and non-farming areas in Ningxia Qingtongxia irrigation area
宁夏青铜峡灌区农区非农区的水盐均衡研究
10.
Prospecting and Prediction Model for Lashuixia Copper-Nickel Deposit in Qinghai
青海拉水峡铜镍矿床综合找矿模型及找矿预测
11.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
12.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践
13.
The Studies on the Operation Management of the Sanmenxia Hydropower Station;
三门峡水电站运营管理若干问题研究
14.
Design of Haidianxia Hydropower Plant Computer Monitoring System and Vibration-Throw Monitoring;
海甸峡水电站计算机监控及振摆监测
15.
Studies on Geohazards of Reservoir Banks of Jishi Valley Hydropower Station, Huanghe River;
黄河积石峡水电站库岸地质灾害研究
16.
Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;
公伯峡水电站施工度汛方案优化设计
17.
Investment control of the construction of the Gongboxia Hydropower Station project;
公伯峡水电站工程建设投资控制分析
18.
Computation of Two-Phase Transient Flow in Li Jia Xia Hydroelectric Power Plant;
李家峡水电站两相非恒定流数值计算