说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙滩水电工程
1.
Software Development and Study of Anticollision System of LongTan Hydroelectric Construction Equipments;
龙滩水电工程设备防撞系统的软件开发与研究
2.
Prediction of the Economic Development for the Circumjacent Reservoir Region of the Longtan Hydropower Project Using Fuzzy Neural Network;
用模糊神经网络定量类比预测龙滩水电工程库周区经济
3.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
4.
Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station
龙滩水电站工程从建设向生产运行的平稳过渡
5.
The Risk and Scheme Analyses of Fast Implementing in the Project of the Left Export Hole at LongTan Hydropower Station;
龙滩水电站左岸导流洞工程快速施工风险及方案分析
6.
More than80% construction funds for the Longtan Hydropower Project is loaned from the Banks so that its financing cost is relative high.
龙滩水电站工程80%建设资金来源于银行贷款,融资费用较高。
7.
THE ANALYSES ABOUT THE HIGH RCC GRAVITY DAM OF THE LONGTAN HYDROELECTRIC STATION;
龙滩水电站高碾压混凝土重力坝施工过程仿真分析
8.
Position and role of Longtan Hydropower Project in the Great Western Development Strategy;
龙滩水电站工程在西部大开发战略中的地位和作用
9.
RCC Engineering Technique Applied to Intake Section of Longtan Hydropower Station
龙滩水电站进水口坝段碾压混凝土施工技术
10.
The application of smooth blasting in drainage tunnel construction of Longtan hydropower station
光面爆破在龙滩水电站排水洞施工中的应用
11.
Contact grouting construction for intake steel linings on left bank of Longtan Hydropower Station
龙滩水电站左岸进水口钢衬接触灌浆施工
12.
Study on Construction Scheme of High Roller Compacted Concrete Dam for Longtan Hydropower Station;
龙滩水电站高碾压混凝土坝施工方案研究
13.
Possibility of Construction Schedule for Longtan Hydropower Project;
龙滩水电站大坝施工进度的可能性研究
14.
Discussions on several major problems in the work of land requisition and resettlement for the Longtan Hydropower Project;
龙滩水电站征地移民工作中几大问题的探讨
15.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
16.
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
17.
The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
结合百龙滩水电站下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。
18.
Summary on the construction of sealing the roof of powerhouse of Fengtan hydropower station expansion works
风滩水电站扩建工程发电厂房封顶施工综述