说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙滩工程
1.
Elementary Introduction on the Cost Control in the Joint Venture by Sinohydro Engineering Bureaus 1,4,7 & 8;
浅谈龙滩工程1478联营体的成本控制
2.
Longtan Reservoir is a Greatest Flood Storage and Best Benefits Project in Guangxi
龙滩工程是广西防洪效益最好的一项工程
3.
Research on Underground Caverns Adjacent Stabilization and Support Parameters of LONGTAN Project;
龙滩工程地下洞室群围岩稳定和支护参数研究
4.
Implementing the 400-m scheme with one-stage completion and bringing the huge benefits of the Longtan Project into full play;
龙滩工程按正常蓄水位400m方案一次建成效益巨大
5.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
6.
Software Development and Study of Anticollision System of LongTan Hydroelectric Construction Equipments;
龙滩水电工程设备防撞系统的软件开发与研究
7.
Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station
龙滩水电站工程从建设向生产运行的平稳过渡
8.
Longtan runner site manufacturing processes and facilities optimization
龙滩转轮现场制造工艺流程及设备配置的优化
9.
The Risk and Scheme Analyses of Fast Implementing in the Project of the Left Export Hole at LongTan Hydropower Station;
龙滩水电站左岸导流洞工程快速施工风险及方案分析
10.
More than80% construction funds for the Longtan Hydropower Project is loaned from the Banks so that its financing cost is relative high.
龙滩水电站工程80%建设资金来源于银行贷款,融资费用较高。
11.
THE ANALYSES ABOUT THE HIGH RCC GRAVITY DAM OF THE LONGTAN HYDROELECTRIC STATION;
龙滩水电站高碾压混凝土重力坝施工过程仿真分析
12.
A Probe the First Speeding-up Enclosing Technology about Silting-up and Encir cling Project(Stage 4)of East Beach in Nanhui District of shanghai;
上海南汇东滩促淤圈围(四期)工程1~#龙口合拢技术的探讨
13.
Position and role of Longtan Hydropower Project in the Great Western Development Strategy;
龙滩水电站工程在西部大开发战略中的地位和作用
14.
Prediction of the Economic Development for the Circumjacent Reservoir Region of the Longtan Hydropower Project Using Fuzzy Neural Network;
用模糊神经网络定量类比预测龙滩水电工程库周区经济
15.
Technical code for engineering survey in beach-shallow sea
滩海工程测量技术规范
16.
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
17.
D. D.134, Lung Kwu Sheung Tan, Tuen Mun. The location of the Project is shown in Figure1 attached to this Permit.
屯门龙鼓上滩丈量约份134号。工程项目的位置见载于本许可证夹附的图1。
18.
The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
结合百龙滩水电站下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。