1) cantilever erection
悬臂拼装
1.
Research on Method of Geometry Control during Cantilever Erection of PC Cable-Stayed Bridges;
预应力混凝土斜拉桥悬臂拼装施工线型控制方法研究
2.
In the segment precasting,cantilever erection and bridge deck construction during the PAKSEY bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line.
在PAKSEY大桥的施工过程中,对节段梁的预制、节段梁的悬臂拼装以及桥面体系的施工进行了精密的测量控制,从而使桥面线形与设计线形的误差最小。
2) cantilever assembly
悬臂拼装
1.
In this paper,construction technologies of cantilever assembly are discussed.
全面论述了悬臂拼装的施工技术措施,重点阐述了浮吊吊装0~2号块、桥面吊机吊装其它梁节以及合龙施工技术,介绍了桥面吊机工作原理、临时预应力施加及悬拼过程监控等重点措施的施工技术。
3) Precast segmental cantilever method
悬臂拼装
1.
This paper emphasizes on the construction control of concrete arch bridge, which is constructed by the precast segmental cantilever method.
本文以悬臂拼装钢筋混凝土拱桥的施工控制为研究对象,结合工程实例,分析了大跨径钢筋混凝土拱桥的悬臂拼装施工方法,认为施工过程中拉索的索力直接影响拱肋截面的应力和拱肋轴线的标高,拱肋截面的应力是悬臂拼装拱桥施工控制的关键因素。
4) cantilever erection method
悬臂拼装法
5) cantilever erection construction
悬臂拼装施工
1.
For the long span prestressed concrete continuous bridge adopting cantilever erection construction method,it was important to make sure the quality and security of segment No.
采用悬臂拼装施工的大跨度预应力混凝土连续梁桥,因0号块梁段的构造和受力较为复杂,保证它的质量与安全非常重要。
6) precast segmental cantilever
多段悬臂拼装
补充资料:悬臂梁冲击强度
分子式:
CAS号:
性质:用悬臂梁形式测定的受试材料冲击强度。试验时将规定尺寸的试样一端夹在试样夹具上,然后释放一个摆锤对试样施加冲击负荷使试样破断。记录其吸收的能量而算得结果。试样可以有缺口,也可以无缺口。其结果分别称悬臂梁缺口冲击强度或悬臂梁无缺口冲击强度。试验中的有关条件都在标准试验方法中有明确规定,单位为kJ/m2。由于该试验方法中被打断的试样飞出带走的一部分能量(称飞出功)无法精确计算,因此不能获得材料破断的确切能量数据,但由于操作简便,故仍被广泛使用。特别是对用简支梁冲击得不到结果的材料,可使用悬臂梁冲击方法。
CAS号:
性质:用悬臂梁形式测定的受试材料冲击强度。试验时将规定尺寸的试样一端夹在试样夹具上,然后释放一个摆锤对试样施加冲击负荷使试样破断。记录其吸收的能量而算得结果。试样可以有缺口,也可以无缺口。其结果分别称悬臂梁缺口冲击强度或悬臂梁无缺口冲击强度。试验中的有关条件都在标准试验方法中有明确规定,单位为kJ/m2。由于该试验方法中被打断的试样飞出带走的一部分能量(称飞出功)无法精确计算,因此不能获得材料破断的确切能量数据,但由于操作简便,故仍被广泛使用。特别是对用简支梁冲击得不到结果的材料,可使用悬臂梁冲击方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条