1) splice joint with cantilever beam
悬臂梁段拼接节点
3) segment installation
节段梁拼装
1.
Some construction technics of concrete beam bridges in segment installation have been discussed in this paper,combined with the construction of prestressed boxing bridges and the handling of the bridging machines in sifeng cloverleaf junction.
结合四丰立交1号匝道工程施工中的预应力箱形梁桥节段梁拼装施工和架桥机的使用,探索了混凝土梁桥节段梁拼装的主要施工工艺,并就可能出现的一些问题进行分析,提出预防措施。
4) precast segmental cantilever
多段悬臂拼装
5) splice joint
拼接节点
1.
By pilot calculation and referring to previous test data,a kind of economical and practical splice joint design method is presented.
通过试算和参考前人所做的试验数据,提出了一种经济实用的拼接节点设计方法,用这种方法所设计的节点在满足承载力和抗震要求的条件下具有较好的延性。
6) hinged cantilever girder
铰接悬臂梁
1.
This thesis analyze the effects which come from the existing disease on prestressed concrete hinged cantilever girder on the beam body of the No.
本论文采用桥梁常规试验与理论计算分析相结合的方法对成昆线孙水河5号桥主桥预应力混凝土铰接悬臂梁既有病害对梁体结构影响进行分析,根据孙水河5号桥的具体情况,结合国内外桥梁加固成功经验,提出3种加固方法:增加桥墩的两跨连续梁方案、增加桥墩的四跨连续梁方案以及跨中梁段增大截面加固方案。
补充资料:悬臂梁冲击强度
分子式:
CAS号:
性质:用悬臂梁形式测定的受试材料冲击强度。试验时将规定尺寸的试样一端夹在试样夹具上,然后释放一个摆锤对试样施加冲击负荷使试样破断。记录其吸收的能量而算得结果。试样可以有缺口,也可以无缺口。其结果分别称悬臂梁缺口冲击强度或悬臂梁无缺口冲击强度。试验中的有关条件都在标准试验方法中有明确规定,单位为kJ/m2。由于该试验方法中被打断的试样飞出带走的一部分能量(称飞出功)无法精确计算,因此不能获得材料破断的确切能量数据,但由于操作简便,故仍被广泛使用。特别是对用简支梁冲击得不到结果的材料,可使用悬臂梁冲击方法。
CAS号:
性质:用悬臂梁形式测定的受试材料冲击强度。试验时将规定尺寸的试样一端夹在试样夹具上,然后释放一个摆锤对试样施加冲击负荷使试样破断。记录其吸收的能量而算得结果。试样可以有缺口,也可以无缺口。其结果分别称悬臂梁缺口冲击强度或悬臂梁无缺口冲击强度。试验中的有关条件都在标准试验方法中有明确规定,单位为kJ/m2。由于该试验方法中被打断的试样飞出带走的一部分能量(称飞出功)无法精确计算,因此不能获得材料破断的确切能量数据,但由于操作简便,故仍被广泛使用。特别是对用简支梁冲击得不到结果的材料,可使用悬臂梁冲击方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条