说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 悬臂拼装
1.
Study on Construction Control of Cantilever Erection Continuous Curved Girder Bridge;
悬臂拼装曲线连续梁桥施工控制研究
2.
Study on Construction Technology of Box Girder Segment s Stub Matching Precast and Cantilever Erection;
箱梁短线匹配预制及悬臂拼装施工技术研究
3.
Study on Construction Geometry Control of Prefabrication Based on Short-Line Method and Cantilever Erection Continuous Girder Bridge;
短线预制悬臂拼装连续梁桥施工线形控制研究
4.
Comprehensive Application of Construction Techniques for Segmental Precasting and Cantilever Assembling to Bridge Works
节段预制、悬臂拼装工艺在工程中的综合运用
5.
Research on Method of Geometry Control during Cantilever Erection of PC Cable-Stayed Bridges;
预应力混凝土斜拉桥悬臂拼装施工线型控制方法研究
6.
Monitoring of Construction and Test under Vehicle Load for Large Boxed Girder with Cantilever Assembled Spines;
大型悬臂拼装脊骨箱梁桥施工监测与车载试验研究
7.
Research and Application of Cantilever Assembly Equipment to Prefabricated Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装设备研究与应用
8.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
9.
cantilever walking crane
壁装移动式悬臂起重机
10.
A case study for Nanning Bridge, the first long span unsymmetrical extroversion arch bridge with curve beam in the world is given.
利用几何方法推导了空间钢箱拱肋节段拼装误差在拱肋最大悬臂端的累积规律。
11.
FINITE ELEMENT ANALYSIS OF BEAM-TO-COLUMN CONNECTION WITH CANTILEVER BEAM BOLTED-SPLICING
带悬臂梁段拼接的梁柱连接有限元分析
12.
These capacity charts show the figures when handling load off main boom head sheaves in a case of mounting fly jib on top of main boom.
这些功能表显示了在主悬臂顶端安装飞臂情况下将负载操作离开主悬臂头滑轮时的数据。
13.
Some suggestions of cantilever installation of steel box shaped girder are given.
对悬拼法钢箱梁安装提出了一些有益的建议。
14.
To add rigidity, braces are sometimes fastened from the overarm to the knee.
为了增加刚性,有时从悬臂到升降台装上一对撑臂加以紧固。
15.
Installation of Tower Crane Used in Cantilever of CCTV Main Building
CCTV主楼悬臂部位大型塔式起重机安装技术
16.
Modal analysis of frame of cantilever NC assembling machine for assembled camshaft
装配式凸轮轴悬臂式数控装配机的机架模态分析
17.
Collapse Mechanism and Design Criterion of Steel Beam-to-Column Connection with Cantilever Beam Splicing under Cyclic Load;
带悬臂梁段拼接的梁柱连接在循环荷载作用下的破坏机理及抗震设计对策
18.
At present, the main front suspensions are of telescopic type and lever type, while the rear is of swing arm type.
目前前悬挂装置主要型式有伸缩管式和杠杆式,后悬挂装置主要型式是摇臂式。