您的位置:首页 -> 词典 -> 悬壁拼装
1)  cantilever splicing
悬壁拼装
2)  cantilever assembly
悬臂拼装
1.
In this paper,construction technologies of cantilever assembly are discussed.
全面论述了悬臂拼装的施工技术措施,重点阐述了浮吊吊装0~2号块、桥面吊机吊装其它梁节以及合龙施工技术,介绍了桥面吊机工作原理、临时预应力施加及悬拼过程监控等重点措施的施工技术。
3)  cantilever erection
悬臂拼装
1.
Research on Method of Geometry Control during Cantilever Erection of PC Cable-Stayed Bridges;
预应力混凝土斜拉桥悬臂拼装施工线型控制方法研究
2.
In the segment precasting,cantilever erection and bridge deck construction during the PAKSEY bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line.
在PAKSEY大桥的施工过程中,对节段梁的预制、节段梁的悬臂拼装以及桥面体系的施工进行了精密的测量控制,从而使桥面线形与设计线形的误差最小。
4)  Precast segmental cantilever method
悬臂拼装
1.
This paper emphasizes on the construction control of concrete arch bridge, which is constructed by the precast segmental cantilever method.
本文以悬臂拼装钢筋混凝土拱桥的施工控制为研究对象,结合工程实例,分析了大跨径钢筋混凝土拱桥的悬臂拼装施工方法,认为施工过程中拉索的索力直接影响拱肋截面的应力和拱肋轴线的标高,拱肋截面的应力是悬臂拼装拱桥施工控制的关键因素。
5)  cantilever erection method
悬臂拼装法
6)  cantilever erection construction
悬臂拼装施工
1.
For the long span prestressed concrete continuous bridge adopting cantilever erection construction method,it was important to make sure the quality and security of segment No.
采用悬臂拼装施工的大跨度预应力混凝土连续梁桥,因0号块梁段的构造和受力较为复杂,保证它的质量与安全非常重要。
补充资料:悬壁长城

位于嘉峪关关城北8公里处石关峡口北侧的黑山北坡。明嘉靖十八年(1539年),为了加强嘉峪关的防御,肃州兵备道李涵在暗壁以外,峡南侧的山头上开始,监筑了一条长15公里的片石夹土墙。工程完成于嘉靖十九年(1540年),使关城防御更加严密,古称“断壁长城”。 因城墙自山上陡跌而下,在山脊上似长城倒挂,铁壁悬空,从山上陡跌而下,封锁了石关峡口,俗称“悬壁长城”。 悬壁长城原墙现只余一截,底阔4米,上宽2米,高0.5-6米不等。片石层厚10-15厘米,土层厚10-12厘米。现存750米长城经1987年重修,其中有231米城墙悬挂于高150米,倾斜度为45’的山脊上,高达6米,片石、土层厚度如旧。在墙头增筑垛墙和宇墙,首尾各添筑一墩台,在首墩和山坡上筑台阶式馒道。游人拾级而上,平坦处如履平地,险峻处如攀绝壁。颇似北京八达岭长城。有诗赞云:“万里长城万里关,迭障黑山暗壁悬”。