说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 挣值法
1)  earned value method
挣值法
1.
The application research of the improving earned value method theory in the construction of project program;
改进挣值法理论在工程项目建设中的应用研究
2.
Improvement and application of earned value method based on the reward and penalty system of time
基于工期奖罚制度的挣值法的改进及应用
3.
As a method of modern project management,earned value method plays important role in project investment/schedule management.
挣值法作为现代项目管理的一种管理方法,在项目投资/进度管理中具有重要作用。
2)  earned value management
挣值法
1.
Application of earned value management in software project s cost and schedule monitoring;
挣值法在软件项目成本和进度监控中的应用
2.
This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.
文章详细阐述了用挣值法进行费用、进度综合分析与控制,即对已完工作预算费用、计划工作预算费用和已完工作实际费用的分析与控制。
3.
The application of the earned value management in the monitoring of cost and supervision of the highway construction project is studied according to an instance in this paper.
文章重点结合一个实例对挣值法在高速公路建设项目成本与进度监控中的应用进行了探讨。
3)  earned value
挣值法
1.
The Project Cost Management and Study of Cost Control by the Earned Value Method;
项目成本管理及挣值法成本监控研究
4)  earned value management
挣得值法
1.
Application of earned value management in developing project management software based on recursive query;
基于递归查询的挣得值法在项目管理软件开发中的应用
2.
It also puts forward a comprehensive cost control of the progress of the construction phase by using the earned value management.
以项目管理学、成本管理学等学科知识为基础,采取理论与实证研究相结合、定量分析与定性分析相结合的研究方法,对青岛地区房地产开发项目建设阶段成本控制进行研究,建立了包含前期阶段成本控制、工程建设阶段成本控制、税务管理等全过程成本控制体系,并利用挣得值法进行工程建设阶段费用进度综合控制,形成具有实际可操作的房地产开发项目全过程成本控制体系,为同类房地产开发项目成本控制工作提供借鉴和参考。
5)  Earned Value Management
挣值管理法
1.
According to the gap of the inefficient combination of progress management and cost in project management at present,considering the coordinated principle of project duration and cost controlling,and using the Earned Value Management as a realization method,it carried out dynamic simulation on union control of duration and cost using the simulink toolbox in MATLAB software.
针对目前工程项目管理中实际存在的进度管理和费用管理不能有效结合的缺陷,从工程项目工期与费用控制协调原理的研究出发,以挣值管理法作为实现手段,应用MATLAB软件中提供的simulink工具箱进行了工程项目进度-费用联合控制的动态仿真,从而提出了一个将进度-费用联合控制思想在工程项目实施中得到应用的一种新途径,并对这种方法的科学性和可行性进行了案例验证。
6)  second-level earned value method
二级挣值法
补充资料:打掕挣
1.亦作"打??F0C2"。 2.困倦立不稳貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条