说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 龙滩电站
1)  Longtan Hydropower Station
龙滩电站
2)  Longtan Hydropower Station
龙滩水电站
1.
Practice and Experience of Environment Protection and Water-soil Conservation Supervision for Longtan Hydropower Station;
龙滩水电站环保水保综合监理的实践与体会
2.
Waste Water Disposal for Macun Aggregate Production System of Longtan Hydropower Station;
龙滩水电站麻村砂石加工系统废水处理
3.
Engineering characteristics of defective geological bodies at right-bank dam abutment of Longtan Hydropower Station and analysis of their causes;
龙滩水电站右岸坝肩边坡不良地质体特征及成因分析
3)  Longtan Hydropower Project
龙滩水电站
1.
Study on the general layout and key technical issues of Longtan Hydropower Project;
龙滩水电站枢纽布置及重大问题研究
2.
Brief introduction of financial management on the Longtan Hydropower Project;
浅谈龙滩水电站工程财务管理
3.
The paper gives a presentation of the excavation process of the underground main power house of the Longtan hydropower project, which is, at the moment, one of the largest underground chambers in the world.
文章介绍了目前世界上规模最大的地下洞室之一,龙滩水电站地下厂房系统的主厂房开挖施工过程。
4)  longtan Hydroelectric Project
龙滩水电站
1.
Study on non-staged construction of NRL 400m scheme of Longtan Hydroelectric Project;
龙滩水电站按正常蓄水位400m方案一次建成研究
2.
Analysis and assessment on the stability of non-excavated slope with inverted creeping rock mass for Longtan Hydroelectric Project;
龙滩水电站蠕变岩体非开挖区边坡稳定性分析与评价
3.
Cause analysis and treatment on accumulatively weathered deep channel at right-bank dam abutment of Longtan Hydroelectric Project;
龙滩水电站右岸坝肩堆积风化深槽成因分析与治理
5)  Longtan project
龙滩水电站
1.
Safety-monitoring data used in Longtan project for high slope construction;
施工期监测资料在龙滩水电站右岸高边坡施工中的应用
2.
The RCC dam of Longtan project is one of the highest dam in the world under construction.
龙滩水电站大坝为目前世界上在建的最高碾压混凝土坝。
3.
Considering the 420m intake high slope and complicated geological conditions at the right bank of Longtan project, pre-stressed anchorage cables of 1 000 kN, 2 000 kN and 3 000 kN grades are adopted for reinforcement support so as to ensure the integral stability of the slope and the long-term safe operation of the project.
龙滩水电站边坡地质条件复杂,进水口边坡最大坡高达420m,为保证左右岸高边坡的整体稳定和工程的长期运行安全,左右岸边坡加固支护中采用了1000kN、2000kN和3000kN级预应力锚索,来提高边坡的整体稳定性。
6)  Huanglongtan Hydropower Station
黄龙滩水电站
1.
2 generating units of Huanglongtan Hydropower Station are located on the Huanglong-Caodian Fault therein with broken foundation rock,serious scour occurs along the foundations of both the outlets under the flood discharge from the dam,which causes a drop chute with the depth of about 10m outside of the outlets and serious inside scour on the lower foundation with three scouring pits.
黄龙滩水电站1、2号机尾水渠出口由于坐落在黄龙—草店大断裂上,基础岩石破碎,受大坝泄洪水流冲刷,出口沿线基础冲刷严重,尾水渠出口外侧为一跌坎,深度10m左右,下部基础向内淘刷严重,有3个淘刷洞。
补充资料:黄河上最大的电站——龙羊峡电站


黄河上最大的电站——龙羊峡电站


  黄河上最大的电站——龙羊峡电站 贺建福撮
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条