说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 凤滩水电厂
1.
Renovation of tail water conical tube of the generator No.2 of Fengtan hydropower station
凤滩水电厂2号机组尾水锥管改造施工工艺及应用
2.
Safety assessment of the third subsidiary power house at Fengtan power station
凤滩电站三副厂房结构安全检测与评估
3.
The precipitation bailing planning of circulation water system construction of Wangtan electric power plant
王滩电厂循环水系统施工降排水方案
4.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
5.
Modeling of 170MW Unit Governor System of Huanglongtan Hydropower Plant
黄龙滩水电厂170MW机组调速系统建模
6.
Protection Measures for Main Transformer in Yantan Hydropower Station
岩滩水力发电厂主变压器的防护处理
7.
Application of C++OOP in the Simulation in Jinshuitan Hydroelectric Plant;
C++面向对象编程在紧水滩水电厂仿真中的应用
8.
Modification of Technical Water Supply Forward(Backward) Control System for Units of Longtan Hydropower Station
龙滩水电厂机组技术供水正(反)向控制系统改造
9.
Test and Research on Exceptional Noise of #1 Generator in Bailongtan Hydropower Plant;
百龙滩水电厂#1发电机组异音测试研究
10.
Summary on the construction of sealing the roof of powerhouse of Fengtan hydropower station expansion works
风滩水电站扩建工程发电厂房封顶施工综述
11.
Seawater desalination electrical and heat controlling system installation technology of Wangtan power plant
王滩电厂海水淡化电气和热控系统安装技术
12.
Seepage Analysis and Seepage Contrd Design in Goupitan Hydropower Station Underground Powerhouse;
构皮滩水电站地下厂房渗流分析及渗控设计
13.
Research on the AGC System of Computer Supervision and Control System of Ertan Hydropower Station;
二滩水力发电厂计算机AGC控制系统研究
14.
Constructing International First-class Hydropower Plant with the Characteristics of Longtan management;
构建具有龙滩管理特色的国际一流水力发电厂
15.
Anticorrosion Measures of Steel Structure in Datang Yantan Hydropower Station
大唐岩滩水力发电厂金属结构的防腐蚀措施
16.
Ventilation Design for Structures at Underground Power House Caverns of Longtan Hydropower Station
龙滩水电站地下厂房洞室群建筑通风设计
17.
Consolidation grouting test of tail water slope for underground factory building of Wu river Goupitan Hydropower station
乌江构皮滩水电站地下厂房尾水边坡固结灌浆试验
18.
Analysis on the Stability of Surounding Rock Mass of Goupitan Hydropower Station Underground Caverns;
构皮滩水电站地下厂房洞室群围岩稳定分析研究