1) the 3rd RCC
三期上游围堰
2) 2nd-stage upstream cofferdam of Three Georges Project
三峡工程二期上游围堰
3) upstream cofferdam
上游围堰
1.
Application of controlled blasting in removal of upstream cofferdam;
控制爆破在上游围堰拆除中的应用
2.
Application of controlled blasting technology in removal of cut-off wall at TGP s upstream cofferdam;
控制爆破在三峡上游围堰防渗墙拆除中的应用
3.
The phase-Ⅱ upstream cofferdam at the Three Gorges project has a maximum height of 82.
三峡工程二期上游围堰最大高度 82 。
4) third-stage RCC cofferdam
三期RCC围堰
1.
Key technical problems of the construction of the third-stage RCC cofferdam of Three Gorges Project;
三峡三期RCC围堰施工关键技术
6) TGP stageⅡ cofferdam
三峡二期围堰
1.
The paper has briefly analyzed the construction new techniques and result of the TGP stageⅡ cofferdam safety monitoring, through analysis we consider that 1.
对三峡二期围堰安全监测施工新技术和监测成果进行简要分析,通过分析认为1。
补充资料:围堰
围堰 cofferdam 围护水工建筑物施工场地,使免受河水影响的临时挡水建筑物。围堰要求施工简单,维护容易,拆除方便,并能满足稳定、防渗、抗冲及一定强度的要求。按与水流方向的相对关系,分为垂直河流方向的横向围堰和平行河流方向的纵向围堰。按是否允许过水,分为过水围堰和不过水围堰。按修建所用材料划分,常用的有土石围堰与混凝土围堰,还有草土围堰、板桩围堰,以及木笼、竹笼或铅丝笼装石围堰等。土石围堰就地取材、结构简单、施工方便,对地基要求较低,故被广泛采用,又分土围堰、土石混合围堰和堆石围堰。混凝土围堰需在岩基上采用,其断面小,占地少,抗冲防渗性能好,堰顶可以过水。板桩围堰有钢板桩、木板桩和钢筋混凝土板桩等形式,可布置成单排、双排或格形体,各有其使用条件。木笼装石围堰可抗4~6米/秒流速,堰顶浇筑混凝土板后可以溢流,可在岸上预制、水上沉放,施工较快,但木材耗用多,拆除不便,现已很少使用。竹笼装石围堰和铅丝笼装石围堰多在中小型工程或局部地段使用。草土围堰是中国黄河流域传统的围堰结构、层土层草,可在流速2~3.5米/秒流水中修筑,挡水高度一般不超过6米。它构造简单,施工方便,拆除容易,但草料用量大,沉陷量较大,草料易腐烂,使用期一般不超过两年。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。