说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三期土石围堰
1.
Comprehensive construction technology for the open channel clos ure and the third stage of earth-rock cofferdam at Three Gorges Project
三峡明渠截流与三期土石围堰工程综合施工技术
2.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究
3.
Research on Technology of Underwater Blasting Compaction for TGP?s High Soil Rock Cofferdam
三峡高土石围堰水下爆炸压实技术研究
4.
3D numerical simulation of overtopping flow field for earth-rockfill cofferdam of Silin hydropower station
思林水电站土石围堰过水流场三维数值模拟
5.
Study on Seepage Analysis and Anti-Seepage Measures by 3-D Fem of Bingling Hydropower Cofferdam;
炳灵水电站土石围堰三维有限元渗流分析及防渗措施研究
6.
Hydration Heat Calculation of Fly Ash in RCC for 3rd Phase Cofferdam of Three Gorges Project
三峡三期围堰碾压混凝土中粉煤灰水化热计算研究
7.
Anti-seepage construction of earth-rockfill cofferdam for Yinpan Hydropower Station
银盘水电站土石围堰防渗施工及评价
8.
Determination of the worst operating condition of overtopped cofferdam
土石过水围堰最不利工况确定的研究
9.
The Random Stability Analysis of the Downstream Concrete Slope Protection of Overflow Earth-rock Cofferdam;
过水土石围堰下游混凝土护板随机稳定性研究
10.
This paper introduces the research results on numerical stress strain analysis and centrifuge model test for the TGP? s high soil rock cofferdam.
介绍了应用数值分析和离心模型试验方法对三峡深水高土石围堰进行应力变形研究的成果。
11.
Initial analysis on anti-seepage project construction of the earth-rork cofferdam in the Shuhe hydropower station
蜀河水电站土石围堰防渗工程施工浅析
12.
Application of modified D-P model to analysis of the second stage cofferdam in Three Gorges Project
修正D-P模型在三峡二期围堰分析中的应用
13.
Finite Element Analyses of Schemes of Low and High Core Walls of Second Stage Cofferdam for Three Gorges Project
三峡工程二期围堰低高防渗心墙方案的有限元分析
14.
Theoretical Study on Mesh-protected Overtopped Rockfill Cofferdam;
过水堆石围堰钢筋网护面的理论研究
15.
Analysis of Stress-Strain and Stability for Longitudinal RCC Cofferdam Foundation in Liuku Hydropower Station;
六库水电站纵向碾压混凝土围堰堰基应力应变及稳定性分析
16.
Three Dimensional Finite Element Analysis on Stress and Deformation of Cofferdam and Cut-off Walls of Shenxigou Hydropower Station
深溪沟水电站围堰堰体及防渗墙应力变形三维有限元分析
17.
Application of finite difference method in seepage calculation of overflow rockfill cofferdam
有限差分法在过水堆石围堰渗流计算中的应用
18.
Construction of the dual-arm steel boxed cofferdam sinking in the thick overburden of the large particle gravel
大粒径卵石厚覆盖层双壁钢套箱围堰下沉施工