1) open-cut metro station
明挖地铁车站
1.
On the mechanical analysis of cracks on side walls in open-cut metro station and its control measures
明挖地铁车站侧墙裂缝机理分析和控制措施
3) embedded metro station
地铁暗挖车站
1.
Zhang Zizhong station on metro line 5 in Beijing is a large-span embedded metro station, and is constructed with shallow tunnelling method which needs to control the settlement of free surface strictly.
施工中根据监测结果和既定控制值,及时变更设计参数和支护措施,成功实现了复杂环境条件下大跨地铁暗挖车站地表沉降值不大于45mm的控制目标。
2.
Zhang Zizhong station on metro line 5 in Beijing is a large-span embedded metro station,and is constructed with shallow tunnelling method which needs to control the settlement of free surface strictly.
施工中根据监测结果和既定控制值,及时变更设计参数和支护措施,成功实现了复杂环境条件下大跨地铁暗挖车站地表沉降值不大于45mm 的控制目标。
4) open-cut station
明挖车站
1.
Winter construction technology of one open-cut station in Shenyang metro;
沈阳地铁某明挖车站冬季施工技术
5) subway station
地铁车站
1.
Terror attack risk assessment of subway station based of game theory;
基于博弈论的地铁车站恐怖袭击风险定量研究
2.
Control of deformation of operating subway station induced by adjacent deep excavation;
基坑开挖引起紧贴运营地铁车站的变形控制研究
3.
Study on seismic responses of a subway station and design parameters of ground motions;
地铁车站的强地震反应分析及设计地震动参数研究
6) metro station
地铁车站
1.
Numerical simulation and analysis of earthquake damages of Dakai metro station caused by Kobe earthquake;
阪神地震中大开地铁车站震害机制数值仿真分析
2.
Numerical simulation of different ventilation strategy designed for vehicle fire in metro station;
不同通风模式下地铁车站内列车火灾的数值模拟
3.
Waterproof Technology for Metro Station with Single Wall Lining in Rich Water and Soft Soil Ground;
富水软土地区单墙衬砌地铁车站防水技术
补充资料:地铁
“地下铁道”的简称。修建在大城市地下的铁路。应用电动客运列车,每小时运载能力可达4~6万人,平均时速35~45千米。由线路、车站、出入口、通风亭,以及通讯、照明、信号等设施组成。世界上第一条地铁是英国伦敦在1863年建成的。中国地铁于1969年在北京首先建成通车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条