说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 明挖地铁车站
1.
Analysis on Design of Atrium Structure of a Metro Station in Nanjing Constructed by Cut and Cover Method
南京某明挖地铁车站的中庭结构设计方法分析
2.
ANALYSIS OF ASEISMATIC CAPACITY OF AN OPEN-CUT SUBWAY STATION STRUCTURE IN BEIJING BASED BY ANSYS
基于ANSYS的北京某明挖地铁车站抗震分析
3.
On the mechanical analysis of cracks on side walls in open-cut metro station and its control measures
明挖地铁车站侧墙裂缝机理分析和控制措施
4.
Analysis on the Foundation Pit Construction Monitoring Technology in Open-Cut Construction in Subway
地铁车站明挖施工基坑监测技术与分析
5.
On Choice of Foundation Pit Support Types of Open-cut Metro Station of Xi'an Metro
西安地铁明挖车站基坑工程的支护型式选择
6.
Study on the Design Optimization of the Fabricated Structure of the Subway Stationg Constructed by Open-Cut Method and the Mechnaical Behaviour of Construction;
明挖装配式地铁车站结构设计优化及施工过程力学特性研究
7.
Research of Metro Station Structure Scheme by Enlarging Shield Tunnel with Open Cut Method
盾构法与明挖法结合建造地铁车站的结构方案研究
8.
APPLICATION OF ONE-SIDE FORMWORK SUPPORTING SYSTEM IN CONSTRUCTION OF OPEN-CUT SUBWAY STATION
单侧模板支撑体系在地铁明挖车站施工中的应用
9.
Design of a Metro Station Combined with Tunnels Crossing in Space and Constructed by Cut and Cover Method and Underground Excavation Method
一座洞室群立体交叉的明暗挖结合地铁车站的设计
10.
Research on the Construction Schemes of Metro Station Driven with Enlarging Shield Tunnels;
盾构扩挖修建地铁车站施工方案研究
11.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
12.
Application of a New Tubular Roof Method in Excavation Work of a Subway Station
NTR工法在地铁暗挖车站工程中的应用
13.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
14.
a subway train, station
地铁列车、 地铁站.
15.
On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station
浅埋暗挖地铁车站地表沉降及既有线变形分析
16.
Research on Influencing Factors of Deep Excavation Adjacent to Subway Station
基坑开挖对邻近地铁车站影响因素研究
17.
Top-Down Construction Technique for Excavation of Working Shaft Cover of TSM in Shanghai Subway Station
上海地铁车站盾构工作井盖挖逆作施工技术
18.
Numerical Simulation with FEM on Deep Foundation Excavation and Timbering of Metro Station;
地铁车站深基坑开挖与支护有限元数值模拟