1.
Application of a New Tubular Roof Method in Excavation Work of a Subway Station
NTR工法在地铁暗挖车站工程中的应用
2.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
3.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
4.
On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station
浅埋暗挖地铁车站地表沉降及既有线变形分析
5.
Three-Dimensional Numerical Simulation and Analysis on Caven-PBA Method for One Shallow Metro Station in Shenyang;
沈阳某地铁车站浅埋暗挖洞桩法三维数值分析
6.
Study on Design and Technology for Building Subway Station with Tunneling and Top-down Method;
地铁车站暗挖逆筑法设计施工技术研究
7.
Research on the Influence of Pile Foundation Near Subway Station Construction;
浅埋暗挖地铁车站施工对近接桩基影响研究
8.
Technology of Top-down Bored Excavation with Cast-in-situ Arch for Metro Station Construction
一次扣拱暗挖逆作法修建地铁车站新技术
9.
Boring Construction Technique of Timbering Piles in Pilot Tunnel of Excavation Subway Station
暗挖地铁车站洞内钻孔围护桩施工技术
10.
Construction Techniques for Double-layer Undermining Entering Hole in the Subway Main Body
地铁车站主体双层暗挖段进洞施工技术
11.
Construction Technique Study on Metro Station and Running Tunnelling by Excavation in Watery Strata;
地铁车站和软弱富水地层暗挖区间隧道施工技术研究
12.
Regulations and Control Measures of Pile Foundation Near Subway Station by Excavation for Shallow Tunnels;
地铁车站浅埋暗挖法施工对邻近桩基的影响及控制措施
13.
Study on Comparison of Mechanical Transformation Mechanism Caused by Side Drifts-support Method and by Central Drifts-column Method for Large Flattened Cross-section Subway Station;
暗挖大断面地铁车站侧洞法和洞柱法施工力学转换机理对比研究
14.
Study on Control Measures of Ground Settlement Due to Subway Station Excavation by Shallow Mining Method;
地铁车站浅埋暗挖法施工引起沉降的控制措施研究
15.
The Research of Large Cross-section and Ultra-shallow Subsurface Subway Station Construction Technology
特大断面超浅埋暗挖地铁车站隧道施工技术研究
16.
Research on Structure Options Adaptable for Metro Stations Constructed by Shield Tunneling Combined with Shallow Mining Excavation
盾构法与浅埋暗挖法结合建造地铁车站技术的结构方案初步研究
17.
MODEL TEST ON METRO STATION CONSTRUCTED BY COMBINATION OF SHIELD METHOD AND SHALLOW-BURIED TUNNELING METHOD
盾构法和浅埋暗挖法结合建造地铁车站的模型试验
18.
Design of a Metro Station Combined with Tunnels Crossing in Space and Constructed by Cut and Cover Method and Underground Excavation Method
一座洞室群立体交叉的明暗挖结合地铁车站的设计