说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡工程一期蓄水后
1.
The Sedimentary Geochemical Partitioning for Changjiang Estuary and Its Adjacent Sea Area during First-stage Storage of San Xia Project;
三峡工程一期蓄水后长江口及其邻近海域表层沉积物地球化学研究
2.
Accretion-Erosion in the Changjiang Subaqueous Delta: Prior to and Post the Impoundment of the Three Gorges Reservoir;
三峡工程蓄水前后长江口门区水下三角洲冲淤变化分析
3.
Effects of the Three Gorges Reservoir (TGR) Phase-Ⅰ Water Storage on the Yangtze River Sediment;
三峡水库一期蓄水对长江泥沙的影响
4.
Influence of the Three Gorges Dam on Suspended Sediment Concentration in the Delta Front of the Yangtze;
三峡工程蓄水前后长江三角洲前缘悬沙浓度的监测分析
5.
Some thoughts and suggestions about clearing reservoir area of Three Gorges Project of Yangtze River during its 3rd stage impoundment;
对长江三峡工程库区3期蓄水库底清理工作的思考及建议
6.
Research of the Changing Process and Regulation on the Upstream and Downstream Waterway of TGP before and after Reservoir Impounding;
三峡工程蓄水前后上下游航道演变及治理措施研究
7.
Surveillance of hemorrhagic fever with renal syndrome before and after in xingshan county in three gorges reservoir area
长江三峡工程蓄水前后库区兴山段肾综合征出血热监测分析
8.
Verification on Some Key Technical Decision-makings through the Trial Impounding of Three Gorges Project
三峡工程试验性蓄水对若干技术决策的验证
9.
Analysis of Riverbed Evolution in Yizhi Branch of Three Gorges Project before Water Storage
三峡工程蓄水前宜枝河段河床演变分析
10.
Water Quality Change in Wushan Section of the Three Gorges Reservoir Area around the Third Stage Impoundment
三峡库区巫山段三期蓄水前后水质状况及其变化趋势研究
11.
Community Structure of the Phytoplankton in the Three Gorges Reservoir after the Third Period of Sluice
三峡水库三期蓄水后浮游植物群落结构特征初步研究
12.
The reservoir of the Three Gorges Project, the largest water control project in the world, has stored10 billion cubic meters of water since the sluice gates were closed on June1.
【参考译文】界上最大的水利控制工程三峡水库自6月一日闭闸以来已蓄水100亿立方米。
13.
The reservoir of the Three Gorges Project, the largest water control project in the world, has stored 10 billion cubic meters of water since the sluice gates were closed on June 1.
世界上最大的水利控制工程三峡水库自6月一日闭闸以来已蓄水100亿立方米。
14.
Influence of Running Water Level in Flood Season of Sanmenxia Reservoir to Altitude in Tongguan After Operation of Method of Storing Clear Water and Discharging Muddy Water
三门峡水库蓄清排浑运行以来汛期运行水位对潼关高程的影响
15.
Influence of the Second Phase Water Level of the Three Gorges Dam Project upon the Tourism Development in Chongqing Reservoir Area;
长江三峡工程二期水位后对重庆库区旅游发展的影响及对策
16.
Preliminary study on bank stability in Jingjiang reach since operation of the Three Gorges Project
三峡工程蓄水运用以来荆江河段河岸稳定性初步研究
17.
Practice on the Third Phase Construction and Management of Three Gorges Project
长江三峡水利枢纽三期工程建设管理实践
18.
Quality Management for the Third Phase Construction of Three Gorges Project
长江三峡水利枢纽三期工程质量管理简介