说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡蓄水
1.
Preliminary analysis on the Zhijiang-Jiangkou channel evolution trend after the impoundment of the Three Gorges Project
三峡蓄水后枝江-江口水道演变趋势初步分析
2.
Analysis of Stability Mechanism of Yichang Low-water Level During TGP's Initial Impoundment Period
三峡蓄水初期宜昌枯水位稳定机理分析
3.
Effects of the Three Gorges Reservoir (TGR) Phase-Ⅰ Water Storage on the Yangtze River Sediment;
三峡水库一期蓄水对长江泥沙的影响
4.
Analysis on hydrological and sediment variation during impoundment stage of 156 m in TGP Reservoir Area
三峡库区156m蓄水水文泥沙变化分析
5.
Exploring and Practice on Sanmenxia Reservoir Operation Mode of "Storing Clear Water and Releasing the Muddy"
三门峡水库“蓄清排浑”运行探索与实践
6.
Time-space Varieties of Heavy Metals in Water Body of the Three Gorges Reservoir after the Water Level Reached 135 Meters;
三峡水库135m蓄水前后水体重金属变异研究
7.
Study on Arsenic, Lead, and Chromium Toxic Heavy Metals in Three Gorges Reservoir Region after Impoundment;
三峡水库蓄水后水体中有毒重金属砷、铅、铬研究
8.
Water Quality Research of Zhongxian in the Three Gorges Reservoir Before and After Impoundment
三峡水库忠县段蓄水前后水质状况研究
9.
The Ecological Research on Crustacean Zooplankton of Three Gorges Reservoir after Impoundment;
三峡水库蓄水后浮游甲壳动物生态学研究
10.
NUMERICAL SIMULATION OF TOTAL DISPLACEMENT FIELD CHANGE AFTER IMPOUNDMENT OF THREE GORGES RESERVOIR
三峡水库蓄水后全位移场变化的数值模拟
11.
Plant communities in newly created wetlands in water-level fluctuation zone of Thre e Gorges Reservoir after flooding to 156 m height.
三峡水库156m蓄水后消落带新生湿地植物群落
12.
Scheme of impounding in advance for the Three Gorges Reservoir by considering the comprehensive utilization benefits
考虑综合利用要求的三峡水库提前蓄水方案
13.
Analysis of river evolution tendency at Zhijiang-Jiangkou Reach after impoundment of Three Gorges Reservoir
三峡水库蓄水后枝江—江口浅滩河段演变趋势
14.
Fish cage culture actualities and countermeasure after impoundment up to water level 156m of Three Gorges Reservoir
三峡水库蓄水至156m后网箱养鱼现状及对策
15.
Studies on Fishery Resources in the Three Gorges of the Yangtze River;
长江三峡库区蓄水后鱼类资源现状的研究
16.
The Emergency Response to the Risk of Navigation Safety As Three Gorges Reservoir Filled to 156 Meters above Sea Level;
三峡库区蓄水156m高程航运安全应急对策
17.
The Electric Capacity Benefit of the Three Gorges Hydropower Stationat Water Storage Level 135 m in the Situation of Cofferdam;
三峡电站蓄水位135m围堰发电的容量效益
18.
New Changes and Countermeasures in Tourism in Three Gorges of Yangtze River After Storing Water;
蓄水后长江三峡旅游的新变化及其对策