1) Integrated costing

集成成本
1.
Activity-based costing(ABC) work out comparatively accurate running cost,EVA highlight the capital importance,the Integrated costing system combine ABC and EVA index together,make equity and liability cost as enterprise asset resource consuming,and come out Activity-Capital Dependence(ACD) approach to interpret capital costing of each activity.
作业成本(ABC)提供了相对准确的产品经营成本信息,经济增加值(EVA)强调了资本成本的重要性,集成成本则集成了ABC和EVA指标,将权益和债务资本成本认定为企业的资本资源耗费,提出了作业-资本项目关系(Activity-CapitalDependence,ACD)分析,以解释每一作业耗用各项资本的金额。
2) ontology integration

本体集成
1.
Context-driven reconciliation in ontology integration;

本体集成中上下文驱动协调(英文)
2.
Evaluation criteria of ontology integration method & its application;

本体集成方法评价指标体系及其应用研究
3.
Research on Ontology Integration Based on E-Connections Theory;

基于E-Connections理论的本体集成研究
3) integrated ontology

集成本体
4) integrated sample

样本集成
1.
Furthermore, it is pointed out that the integrated sample is one of the valid methods in which the data compression ratio is raised.
给出一种压缩比和失真可调的SAVQ压缩方法,指出提高数据压缩比的有效方法之一为样本集成,同时介绍了用该技术对北京天文台太阳射电频谱仪上的两个波段(1。
5) agglomerative cost

聚集成本
6) collecting cost

收集成本
补充资料:集成
同类著作汇集在一起(多用做书名):《丛书~》ㄧ《中国古典戏曲论著~》。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条