1) pre-project evaluation
前期评价
1.
In order to make the right decision, the well pre-project evaluation of real estate construction project is the premise.
而做出正确投资决策的前提是做好房地产开发建设项目的前期评价工作。
2) appraisal of pre-planning
前期策划评价
1.
First of all,based on the comparison of the two concepts,this paper gives the concept of appraisal of pre-planning,and then introduces the structure and procedures of PDRI-Building Projects with great emphasis.
前期策划评价不同于决策阶段的项目评估,首先根据二者的比较对前期策划评价的定义进行了阐释,然后着重介绍了PDRI-Building Projects的结构及其评价方法和步骤,最后分析了该评价指标体系对策划者的指导作用。
4) pre-evaluation
事前评价
1.
A Pre-evaluation Model and Its Demonstration for Manufacturing Information System Project;
制造业信息化建设的事前评价模型及实证分析
2.
Setting out from enterprise performance,this paper establishes a practical pre-evaluation index system for enterprise with the view of Balanced Scorecard,and with the fuzzy comprehensive evaluation,and evaluates now-existing system as a whole.
从企业绩效的角度出发,基于平衡计分卡思想制定了适合企业信息化事前评价的指标体系,利用模糊综合评判法对该企业进行整体评价。
3.
This is the pre-evaluation.
工程技术项目的事前评价是科技评价的一项重要内容,它是项目实施的基础。
5) ex-ante evaluation
事前评价
1.
Propose an ex-ante evaluation method of Aviation Maintenance Information System(AMIS) incorporating Goal Programming(GP),Analytic Network Process(ANP) and aggregation operators.
融合目标规划、网络分析法和集结算子,提出一种航空维修信息系统的事前评价方法。
2.
An index system for ex-ante evaluation of information system is built.
给出了信息系统事前评价的指标体系。
补充资料:前期
1.所定日期之前;事情出现之前。 2.事前或过去的约定;预定。 3.对未来的预期﹐打算。 4.某一时期的前一阶段。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条