1.
Pre-Project Evaluation on the 2×600MW Expansion Project of Hebei Longshan Power Plant;
国电河北龙山发电厂2×600MW建设项目前期评价
2.
Preliminary Evaluation Research on Rational Development Mode in the Pilot Area of Qi Jiabei Region
齐家北试验区合理开发方式前期评价研究
3.
A Brief Discussion of the Modern Neo-Confucianism in the First Half of the 20th Century;
20世纪前半期现代新儒学评价研究
4.
Research on Pre-planning Appraisal Index System in Construction Project
建设项目前期策划评价指标体系研究
5.
- During the initial research period, an appraisal of the impact of the railway line on the environment was carefully conducted.
——在前期研究工作阶段,切实做好环境影响评价。
6.
Preliminary Analysis and Assessment of Regional Engineering Geological Conditions in Beijing Yizhuang Town;
北京亦庄规划新城前期区域工程地质评价分析
7.
The Assessment of Social Impacts and its Application in Urban Construction Project at Early Stage;
城市建设项目前期社会影响评价及其应用
8.
Some Suggestions About Preparation Work and Economic Evaluation of Project;
做好项目前期工作和经济评价的几点认识
9.
The Study on Pre-evaluation of Construction Project of Bengbu No.2 Power Plant
国电蚌埠发电厂二期扩建工程项目前评价研究
10.
Diagnostic value of 64-slice spiral CT colonography in TN staging of colorectal carcinomas
64排螺旋CT结肠成像评价结直肠癌术前TN分期
11.
Analysis clinical risk factors for placenta previa and evaluation of expected treatment
前置胎盘发病相关因素及期待治疗效果评价
12.
APPLICATION PROSPECTS OF LIFE CYCLE ASSESSMENT IN COPPER SLAG RECOVERY PROCESS
生命周期评价在铜渣回收工艺中的应用前景
13.
The clinical value of double-phase three-dimensional 16-detector row computed tomographic angiography in Pre-operation of meningioma
16层螺旋CT双期3D-CTA对脑膜瘤术前评估的价值
14.
Photoselective Vaporization of the Prostate for the Treatment of Benign Prostatic Hyperplasia:Initial Clinical Outcomes
光选择性前列腺气化术治疗良性前列腺增生短期疗效评价
15.
Research progress on evaluation of premenstrual syndrome and premenstrual dysphoric disorder
经前期综合征和经前焦虑性障碍的评价研究进展
16.
The Efficacy of Early Versus Late Reconstruction for Anterior Cruciate Ligament Rupture: A Systematic Review;
膝关节前交叉韧带损伤的早期手术和晚期手术的系统评价
17.
2×330MW Project Pre-evaluation Study of Ningdong Guohua Power Company
国华宁东发电有限公司一期2×330MW机组工程项目前期综合评价研究
18.
The Pre-Comprehensive Evaluation of Phase Ⅳ 4X1000MW Project Construction Program in ShiHeng Power Plant
石横电厂四期4X1000MW工程建设项目前期综合评价研究