1) over gas tower
排气吸收塔
2) The tower of absorb the remnant air
尾气吸收塔
3) chlorine absorption tower
氯气吸收塔
1.
This article introduces the design principle,process flow,chlorine water-seal tank and chlorine absorption tower.
介绍了氯气紧急处理装置的设计原理、工艺流程及氯氧水封槽 ,氯气吸收塔的设计原则 ,并指出几点注意事
4) waste-gas adsorption tower
废气吸收塔
1.
According to the problems which would happen when the waste-gas adsorption tower in the poly-unit of the plant is running,this paper analyses the reasons and offeres some developing suggestions.
针对安庆石化腈纶厂聚合装置废气吸收塔运行中存在的问题,分析其影响因素,并据此提出改进意见。
5) gas absorption tower
气体吸收塔
6) Absorber offgas(AOG)
吸收塔尾气(AOG)
补充资料:硫酸尾气塔整体吊装
硫酸尾气塔整体吊装
凶 硫酸尾气塔整体吊装
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条