1) LPG absorbing tower
液化气吸收塔
1.
The principle and scheme of selective control on process variables of LPG absorbing tower by use of DCS is explained in detail, including the selection and implementation of field instrument.
本文详细介绍了应用 D C S 对液化气吸收塔的工艺参数实现选择性控制的原理和方案,以及现场仪表的选型和实施。
3) The tower of absorb the remnant air
尾气吸收塔
4) chlorine absorption tower
氯气吸收塔
1.
This article introduces the design principle,process flow,chlorine water-seal tank and chlorine absorption tower.
介绍了氯气紧急处理装置的设计原理、工艺流程及氯氧水封槽 ,氯气吸收塔的设计原则 ,并指出几点注意事
5) waste-gas adsorption tower
废气吸收塔
1.
According to the problems which would happen when the waste-gas adsorption tower in the poly-unit of the plant is running,this paper analyses the reasons and offeres some developing suggestions.
针对安庆石化腈纶厂聚合装置废气吸收塔运行中存在的问题,分析其影响因素,并据此提出改进意见。
6) gas absorption tower
气体吸收塔
补充资料:LNG船(见液化天然气船)
LNG船(见液化天然气船)
liquified natural gas carrier
LNG船(liquified natural gas earrier)见液化天然气船。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条