说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 先漏后喷
1)  loss circulation followed blowout
先漏后喷
2)  leaking before breaking
先漏后破
1.
At the same time, if the processing tower was evaluated with the LBB criteria, it was also shown that the tower met the principle of leaking before breaking.
同时 ,按LBB准则判别工艺塔的失效模式 ,结果表明符合先漏后破准
3)  leak before break
先漏后断
1.
The Leak Before Break (LBB) analysis is a new technology developed in recent twenty years and widely used in the design and safety evaluation of welded pressure pipes.
对于压力管道等承压构件来说,经常出现结构在断裂之前先发生内部液体稳定泄漏的现象,称为“先漏后断”LBB(Leak-Before-Break)。
4)  leak-before-break criterion
先漏后破准则
5)  the Overlapping and deficient spraying area
重喷漏喷
6)  before and after
先后
补充资料:破漏
1.古代迷信,谓日子有冲破,不吉利。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条