1) pooled vacation plan
总休假计划
2) work furlough program
工作休假计划
3) paid vacation plan
照付工薪的休假计划
4) holiday staggering plan
轮休计划
5) retirement plan
退休计划
1.
(4)Retirement plan,Saez has analyzed behavior of participants to employee-oriented in retirement plans,groundbreaking has studied participation and the investment decision of the employee in the retirement savings deposit plan,with group effect whether to be playing an important rol
(4)退休计划,塞斯分析了雇员导向型退休计划参与者的行为,开创性地研究了雇员在退休储蓄存款计划的参与和投资决策中,同群效应是否起着重要作用。
6) unscheduled delay
无计划休风
1.
2 1880-m3 blast furnace,under the circumstance of longer unscheduled delay,measures like elevating hearth heat,well controlling tuyere flame temperature and iron tapping were adopted after its reblow,considerably shortening its resuming time and minimizing the loss.
莱钢2#1880m3高炉在无计划休风时间较长的情况下,复风后采取了提高炉缸热量、控制好风口火焰温度及抓好炉前出铁等措施,大大缩短了高炉的恢复时间,将损失降低到最低水平。
补充资料:社会总产品与社会总产值
社会总产品,是指社会各个物质生产部门在一定时期内(通常以年度为单位)所生产出来的全部物质产品的总和。社会总产品也就是社会的商品资本总体,它们的价值也就是社会总产值。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条