说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 非完整分量
1)  nonholonomic component
非完整分量
2)  nonholonomic variations
非完整变分
1.
, nonholonomic variations: the vakonomic, the Hlder and the Suslov by means of vector fields on the extended configuration manifold.
就一般非完整约束系统,从约束方程满足的变分恒等式出发,利用增广位形流形上的向量场定义三类非自由变分,即非完整变分:vakonomic变分、Hlder变分、Suslov变分,并讨论它们之间的关系以及它们成为自由变分的充要条件。
3)  partial penetrating river
非完整河
1.
In this paper,the integrity is defined,ant then considering the dissected extent of the river and the width of the riverbed,groundwater flow near partial penetrating river is simulated with numerical method,and the result is compared with that of analytic .
对河流完整性进行了定义,并采用数值模拟的方法考虑河流切割含水层的深度及河床宽度的不同,对非完整河附近的地下水运动进行了模拟,并与解析解进行了比较。
4)  nonholonomic
非完整
1.
Nonholonomic Motion Planning of a Space Manipulator System Using Genetic Algorithm;
空间机械臂非完整运动规划的遗传算法研究
2.
The Nonholonomic Redundancy of Under-actuated Redundant Manipulators;
欠驱动余度机械臂的非完整冗余特征研究
3.
Nonholonomic Motion Planning of Space Manipulator with Prismatic Joint Using Genetic Algorithm;
带滑移铰空间机械臂的非完整运动规划遗传算法
5)  intact pile
非完整桩
1.
Numerical calculation of torsional vibration of intact piles;
非完整桩扭转振动问题的数值计算
6)  partially penetrated well
非完整井
1.
The partially penetrated well and unsteady flow theory are used to design the dewatering project, and Modflow 3-D flow Model software is used to test it at Tower Building of Shanghai Global Finance Center in the confined aquifers, of which the first, second and third confined aquifers have direct connection each to other.
上海环球金融中心塔楼区降水工程采用非完整井非稳定流理论设计,三维数值模型验证,在上海第一、二、三承压含水层相互连通的承压含水层组中采取降水手段,科学设计、精心施工和严格管理,确保了塔楼深基坑安全开挖和大底板正常施工,同时保证了周边环境的安全和稳定。
2.
Based on analyzing the discharge of the partially penetrated wells in phreatic aquifer,introducing the conception of "the effective zone"of pumping,probing into the feasibility and comparative error by translating the calculation of the discharge of the partially penetrated wells into the calculation of the discharge of the equivalent completely penetrated wells.
通过对潜水含水层中的非完整井基坑涌水量计算方法的分析 ,探讨引入抽水“有效带”的概念 ,将非完整井群涌水量计算转化为等效完整井群涌水量计算方法的可行性及由此产生的相对误差大小。
3.
The partially penetrated well and unsteady flew theory are used to design the dewatering project, and Modf-low 3 - D flow Model software is used to test it at Tower Building of Shanghai Global Finance Center in the confined aquifers, of which the first, second and third confined aquifers have direct connection each to other.
上海环球金融中心塔楼区降水工程采用非完整井非稳定流理论设计,三维数值模型验证,在上海第一、二、三承压含水层相互连通的承压含水层组中采取降水手段,科学设计、精心施工和严格管理,确保了塔楱深基坑安全开挖和大底板正常施工,同时保证了周边环境的安全和稳定。
补充资料:非完整系统


非完整系统
non -hokmanric systems

  数.多数情况下考察相对于交‘为线性的约束(l) 3份 ,酥‘£“x·+‘:“一”;As‘(x,‘),‘、(x,‘)“c’·约束(1)当日中/肚兰0时称为定常的.这些约束还对于点的加速度w,施加条件: a中:_书___」 常一乡1咧;.,:·w,十一。. 按照H .r.取TaeB,受到非线性约束(l)限制的系统的可能的运动满足如下类型的条件: 梦日毋, 乙份兴咨x。,0,“l,…,m.(2) 渭一日又v在线性约束的情况下,这些条件意味着通常的关系式 3刀 冬‘:,‘X!一。·.与完整系统的情况不同,在相距无限小距离内的相邻位置间的运动在非完整系统中可能是不可能的(见【1」). 在广义加邵即罗坐标系中,方程(l),(2)可以写成 小,(q;,…,砚。,4、,…,母。,r)二o, 小刁必:.__。_, 乙~于笋占q:=0,s=l,’“,m· ‘荀刁q‘在一个非完整系统中,自由度数”一m比独立坐标伍的数n小一个不可积约束方程数m对于不完整系统推导出了许多各种形式的运动微分方程,如第一类助g-份n罗方程(见U脚.咨方程(力学中的)(肠邵明罗闪谬行毗(in~ha川es))),助笋列笋坐标系和准坐标系中的A卯d方程(却详U闪Uatio璐),U即阳罗坐标系中的Ha~‘rHH和B叩OHe双方程,BJtZ翻以.1方程(泊心lt2刀期Lnn闰uatjon),准坐标系中的Hatr岭1方程,等等(见[3]). 非完整系统的特点在于,在一般情况下,它们的运动微分方程包括约束方程.非完整系统[叨一州‘..血男动即侣;毗功~枕。e“-cTeMH] 所受的约束中有对各点在所有可能位置上的速度(而不是位置)施加的运动学约束的质点系(见完整系统(ho10nomies”teln));这些约束假定为可以表达成不可积微分关系式 价:(x,,…,x3、,交:,…,又。、)=o,(l) S二l,”’,m,毋:(x,交,r)‘C,,它们不能为坐标的等价有限关系式所代替.这里,xv代表点的L犯s。汀tes坐标,t为时间,N为系统中的点
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条