1)  construction diversion and closure
施工导截流
1.
To solve the problems existed in construction diversion and closure system simulation at present such as hard modeling of simulation computation, poor transplantablity of program, separation between computation and data results, and difficult realization of simulation visualization, structural drawing-oriented simulation theory and method is presented in this thesis.
针对目前施工导截流系统仿真中存在的仿真建模复杂、程序通用性差,仿真计算与数据生成过程相分离以及仿真可视化难以实现等问题,本文提出了面向结构图的施工导截流系统仿真理论与方法。
2)  river closure construction
截流施工
1.
Some problems existing in practical application of tetrahedron concrete in river closure construction are analyzed through the comparison of its effect with that of oversize rock in stability of erosion control and convenience in construction.
指出:①混凝土四面体密度、综合稳定系数、化引球形粒径都偏小,在龙口的抗冲稳定性不如特大块石;②混凝土四面体制作麻烦,成本高,占地面积大,装运困难,抛投强度低,施工不如特大块石方便;③在截流施工中宜优先使用特大块石,慎用混凝土四面体。
2.
The river closure design of Jinhe Hydropower Station is described, comprising;(1) arrangement of construction;(2) material sources for river closure; (3) river closure design;(4) river closure construction;(5) river closure measures; etc.
介绍了金河电站截流施工设计,具体包括:(1)施工布置;(2)截流料源;(3)截流设计;(4) 截流施工;(5)截流保证措施等。
3.
The site river closure construction must be organized carefully,properly and scientifically.
现场截流施工必须认真合理地组织和科学地指挥。
3)  river closure
施工截流
1.
Risk estimation of river closure based on the Monte_Carlo method;
基于Monte-Carlo方法的施工截流风险率估计方法研究
4)  construction diversion
施工导流
1.
Construction diversion tunnel design for Naen HPP;
那恩水电站施工导流隧洞设计
2.
Application of Galerkin meshless method to two-dimensional numerical simulation of construction diversion;
无网格伽辽金法在施工导流二维数值模拟中的应用
3.
Integrated risk of construction diversion system based on the Monte-Carlo method;
基于Monte-Carlo方法的施工导流系统综合风险分析
5)  River diversion
施工导流
1.
Essential problems in the process of construction planning for LHP are discussed in this paper, such as the pre_stage engineering design, bid preparation for main structures, river diversion, controlling construction schedule and methods for RCC dam constrction, etc.
介绍龙滩工程施工规划设计中的几个主要问题 ,包括前期工程设计、主体土建工程分标、施工导流、施工控制性进度及碾压混凝土坝施工方案等。
2.
The effects of various hydraulic factors on river diversion risk are analyzed.
本文利用改进的一次二阶矩法计算导流风险,分析了水力因素对施工导流综合风险计算的影响,并具体分析了各水力不确定性因素在综合风险计算中的作用。
3.
Consequently, research works must be done not only on stability of cofferdam feet, channel scour, protection of the bank and so on, but also on navigation problems and salvation of downstream river during river diversion construction.
我国在建或规划设计中的大型水电站主要集中在大江大河的干流上,其电站规模巨大,施工导流工期较长,在施工导流期间不仅需要研究围堰堰脚稳定、河床冲刷、岸坡保护等问题,还需要考虑施工导流期间通航、下游河道淤积等问题。
6)  diversion construction
导流施工
补充资料:脉心导敏 ,脉导敏,英他佐明,麦新导明
药物名称:吗多明

英文名:Molsidomine

别名: 吗导敏;吗多明;吗斯酮胺;脉心导敏 ,脉导敏,英他佐明,麦新导明
外文名:Molsidomine
特点:
脉导敏是一种属于亚胺类化合物,其作用与硝酸盐相似。舌下含服1毫克,2~4分钟起作用,可阻止心绞痛发作。口服一次可持续6~7小时,剂量每天3次,每次2毫克。副作用包括头痛、头胀、脸部发热感等,但不多见。
适应症:
防治心绞痛的发作。
用量用法:
口服:1次1~2mg,1日2~3次,发作时舌下含服:1次2mg。喷雾吸入:每次揿吸1~2次(相当于本品0.2~0.4mg),每日次数酌定。
注意事项:
1.一般不良反应可有头痛、面部潮红、眩晕等,停药后可自行消失。 2.低血压、青光眼病人忌用。
规格: 片剂:每片1mg、2mg。 气雾剂:每瓶含42mg(可揿吸200次左右)。





类别:非选择性钙通道阻滞剂||防治心绞痛药
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条