1.
Structural Drawing-Oriented Simulation Theory and Application of Construction Diversion and Closure System;
面向结构图的施工导截流系统仿真理论与应用研究
2.
Study on Large-scale Channel Diversion and the Key Technologies of Construction Closure
大型导流明渠截流施工关键技术研究
3.
The conduction and damming current planning choice and the construction of Jilintai the first level hydroelectric power station
吉林台一级水电站导截流设计及施工
4.
Design and construction of Xian Ren Bei hydroelectric station second-stage closure work
仙人陂水电站二期截流工程设计与施工
5.
1st Phase River Closure Engineering on Outer River of Changzhou Hydraulic Complex
长洲水利枢纽工程一期外江截流施工技术
6.
River Closure Model Test and Study for Construction of Xiaowan Hydropower Project on the Lancang River
澜沧江小湾水电站施工截流模型试验研究
7.
Hydraulic Analysis and Construction Technology of the End-dump Closure for a single Embankment
单戗堤立堵截流水力分析及施工技术探讨
8.
Construction Design on Second-phase Cofferdam and River Closure of Tingzikou Water Control Project
亭子口水利枢纽二期围堰与大江截流施工设计
9.
Diversion cofferdam design and the construction of Huilong hydropower station
回龙水电站施工导流围堰设计与施工
10.
Design Options for Ji'ning Pollutant Water Diversion Project
济宁市截污导流工程蓄水区设计方案选择
11.
Guide for design of construction diversion for hydropower and water conservancy project
水电水利工程施工导流设计导则
12.
Study on Installation and Construction Technique for Large Cross Area Conductor in UHV Transmission Lines
特高压输电线路大截面导线架线施工工艺的研究
13.
Comprehensive construction technology for the open channel clos ure and the third stage of earth-rock cofferdam at Three Gorges Project
三峡明渠截流与三期土石围堰工程综合施工技术
14.
Phase I damming engineering for the workshop and desilting sluice of Jialing river caojie navigation-power junction
嘉陵江草街航电枢纽厂房及冲沙闸工程一期截流施工
15.
Design of Ningyang Guanghe River Pollutant Diversion of the Eastern Route of the South-to-North Water Transfer Project
南水北调东线工程宁阳洸河截污导流工程方案设计
16.
Study on Decision Making of Construction Diversion Scheme;
水利水电工程施工导流方案决策研究
17.
Study on Value η of Outlet of Diversion Tunnel in Model Test
施工导流模型试验中导流洞出口η值的研究
18.
The environment quality of the construction site is good, and moreover, it has improved year by year since the damming of the Yangtze River and tends to remain stable."
施工区环境质量良好,且自大江截流以来逐年好转,趋于稳定。”