1) flood diversion for the construction period
施工导流流量
1.
The optimal design method which the flood diversion for the construction period can be reduced for construction of the downstream cascade reservoirs by changing reservoir operation for regulation reservoir on the upper reaches of cascade reservoir was presented in the paper.
通过汛期临时改变梯级水库上游可调节水库运行方式,提出减小梯级水库下游工程施工导流流量的优化设计方法,并以黄河上游积石峡水电站施工导流流量的优化设计为例进行分析计算。
2) construction diversion
施工导流
1.
Construction diversion tunnel design for Naen HPP;
那恩水电站施工导流隧洞设计
2.
Application of Galerkin meshless method to two-dimensional numerical simulation of construction diversion;
无网格伽辽金法在施工导流二维数值模拟中的应用
3.
Integrated risk of construction diversion system based on the Monte-Carlo method;
基于Monte-Carlo方法的施工导流系统综合风险分析
3) River diversion
施工导流
1.
Essential problems in the process of construction planning for LHP are discussed in this paper, such as the pre_stage engineering design, bid preparation for main structures, river diversion, controlling construction schedule and methods for RCC dam constrction, etc.
介绍龙滩工程施工规划设计中的几个主要问题 ,包括前期工程设计、主体土建工程分标、施工导流、施工控制性进度及碾压混凝土坝施工方案等。
2.
The effects of various hydraulic factors on river diversion risk are analyzed.
本文利用改进的一次二阶矩法计算导流风险,分析了水力因素对施工导流综合风险计算的影响,并具体分析了各水力不确定性因素在综合风险计算中的作用。
3.
Consequently, research works must be done not only on stability of cofferdam feet, channel scour, protection of the bank and so on, but also on navigation problems and salvation of downstream river during river diversion construction.
我国在建或规划设计中的大型水电站主要集中在大江大河的干流上,其电站规模巨大,施工导流工期较长,在施工导流期间不仅需要研究围堰堰脚稳定、河床冲刷、岸坡保护等问题,还需要考虑施工导流期间通航、下游河道淤积等问题。
4) diversion construction
导流施工
5) construction diversion and closure
施工导截流
1.
To solve the problems existed in construction diversion and closure system simulation at present such as hard modeling of simulation computation, poor transplantablity of program, separation between computation and data results, and difficult realization of simulation visualization, structural drawing-oriented simulation theory and method is presented in this thesis.
针对目前施工导截流系统仿真中存在的仿真建模复杂、程序通用性差,仿真计算与数据生成过程相分离以及仿真可视化难以实现等问题,本文提出了面向结构图的施工导截流系统仿真理论与方法。
6) 3rd-phase construction diversion
三期施工导流
补充资料:施工导流
施工导流 construction diversion 在水域内修建水利工程的过程中,为创造干地施工条件,用围堰围护基坑,将河水通过预定方式导向下游的工程措施。导流方案的选定关系到整个工程施工的工期、质量、造价和安全度汛,事先要有周密设计,施工要像对待主体工程那样重视。导流方式分河床外导流与河床内导流。前者用围堰一次拦断整个河床,河水通过河床外的导流泄水建筑物导向下游;后者用围堰先后分段围护部分河床,河水通过被束窄的另一部分河床导走,即分期导流。按泄水建筑物类型分,有明渠导流、涵洞或隧洞导流,以及坝体底孔、梳齿或缺口过流等导流方式。涵洞导流多用于中小型水闸、土石坝等工程,底孔导流用于混凝土坝施工。梳齿导流则是在混凝土坝施工时预留梳齿状缺口过水,随坝体升高,分级轮换封堵缺口。 |