2) relation path
关系路径
3) critical path
关键路径
1.
The earned value analysis in project schedule based on critical path;
基于关键路径的项目进度挣值分析
2.
Workflow critical path algorithm based on activities;
基于活动的工作流关键路径算法
3.
The activities sequence in critical path of highway project network;
道路工程项目网络关键路径中的活动排序问题
4) relating path
关联路径
1.
The paper introduced two kinds of graph theory algorithm which is suitable to select other nodes and estimate relating path in actual system on basis of finding out shortest path of node.
在分析过程中以寻求节点最短路径为基础,介绍了两条图论算法,并且这种算法适用于实际系统中其它节点选取以及关联路径的判断。
5) key path
关键路径
1.
Study of time parameter and key path arithmetic in engineering building project network planning;
工程网络计划的时间参数与关键路径算法研究
2.
Affecting factors analysis of major equipment erection key path in PWR NPP;
压水堆核电站主设备安装关键路径影响因素分析
3.
Based on the utility analysis in the economics,by searching the key path between a traffic mode and another transfer mode in the intermodal transfer points,a utility cost model is put forward to evaluate and optimize the facilities layout alternatives of the urban intermodal passenger transfer points.
利用经济学中效用分析法,通过寻找枢纽内存在换乘的任何2种交通方式之间的关键路径,建立枢纽内设施不同布局方案的效用损失模型,以此评价和优化枢纽内设施布局方案。
6) path independence
路径无关
1.
By using a complex function method and changing J integral to complex form,the path independence of J integral near I mode, Ⅱ mode and mixed mode crack tips in principal elasticity direction were proved, and the computing formulae of the J integral were derived.
借助于复变函数方法 ,通过将J积分化为复形式 ,首先证明了弹性主方向的Ⅰ型、Ⅱ型、混合型裂纹尖端附近的J积分的路径无关性 ,推出了该J积分的计算公式。
2.
And then,by calculating the mean values of the unwrapped phase along multiple certain directions,the goal of path independence can be achieved.
首先建立了一个消除局部不连续点的模型,利用此模型可有效地消除包裹相位图中的不连续点,同时不会影响到其他正常点;在此基础上进行多方向去包裹运算,然后求其平均值,从而达到与路径无关的目的。
3.
The problem of path independence of choice function is investigated in this paper.
研究选择函数的路径无关性问题。
补充资料:经济关系(见生产关系)
经济关系(见生产关系)
economical relation
1 ingji gU口nxj经济关系(eeonomieal relation)系。见生产关
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条