1)  Man-hour quota
工时定额制定
2)  short-time rating
额定短时工作制
3)  man-hour quota
工时定额
1.
Establishment of man-hour quota for mould design based on analogism;
基于类推比较的模具设计工时定额制定方法研究
2.
The application of genetic neural network in calculating man-hour quota
遗传神经网络在工时定额计算中的应用
3.
A universal system of computer-aided man-hour quota,based on primitives theory,is proposed,in which man-hour quota is constituted according to the data obtained by work study method in workshop and the rule of man-hour variety is studied by neural network.
提出了一种基于基元理论,以工作研究法现场测定数据作为制定定额的依据,运用神经网络研究工时变化规律的通用化计算机辅助工时定额系统,在此基础上探讨了工时的分类划分,阐明了系统的体系结构和功能模块,最后介绍了系统的应用流程。
4)  Man-hour ration
工时定额
1.
Standard parameter database of man-hour calculation is set up and an applied software of man-hour ration management system is developed by integrating the application of mathematic model and computer query,taking Delphi and Access as develop tool,and ODBC as database interface.
采用数学模型与计算机查表综合应用的方法,以Delphi和Access数据库作为开发工具,ODBC为数据库接口,建立了工时计算标准参数数据库,开发出了实用的工时定额管理软件。
2.
The quality of man-hour ration management influences working-time, using ratio of equipment, cycle of production and reward, etc.
工时定额管理是企业的一项重要基础管理,是企业计划管理、经济核算、生产进度调控、成本控制、产品报价的重要依据,也是促进企业劳动生产率提高的重要手段。
5)  time quota
工时定额
1.
Research on Ration Predetermining Model in Computer Aided Time Quota Ration System Based on Primitives;
计算机辅助工时定额系统中的定额测算模型研究
2.
Study and Development on the Time Quota Module for Injection Mould CAPP System;
注塑模具CAPP系统工时定额模块的研究与开发
3.
Study and Development of Computer Aided System for Time Quota Management System Based on MODAPTS;
基于MODAPTS的计算机辅助工时定额管理系统研究与开发
6)  Standard time
工时定额
1.
In the current enterprises the Standard Time of the procedure is calculated manually, and influenced by man-made factors, enterprise information integration and sharing of resources is achieved difficultly.
针对当前企业中工时定额通过手工制定,人为因素影响比较大,无法实现企业资源共享和信息集成的问题,分析了影响工时定额的主要因素以及工时定额制定的工艺特点,研究了工艺标准化技术、工时定额的制定技术以及工时定额合理性验证技术等关键技术,讨论了基于Web Service协同工时定额系统,提出了基于工艺标准化的工时定额制定技术。
2.
The enterprise named Z is a OKP (one-of-a-kind production) manufactures enterprise, which is required to make its product process and standard time quickly and exactly.
工时定额是安排作业计划、进行成本核算、确定设备数量、人员编制以及规划生产面积的重要依据。