说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工时定额规划
1)  man-hour planning
工时定额规划
1.
Process planning frame and man-hour planning method in integration platform were discussed in detail.
详细说明了集成仿真平台中的工艺规划结构和工时定额规划的方法,最终通过实例表明了生产线仿真对工艺规划的辅助作用。
2)  man-hour quota
工时定额
1.
Establishment of man-hour quota for mould design based on analogism;
基于类推比较的模具设计工时定额制定方法研究
2.
The application of genetic neural network in calculating man-hour quota
遗传神经网络在工时定额计算中的应用
3.
A universal system of computer-aided man-hour quota,based on primitives theory,is proposed,in which man-hour quota is constituted according to the data obtained by work study method in workshop and the rule of man-hour variety is studied by neural network.
提出了一种基于基元理论,以工作研究法现场测定数据作为制定定额的依据,运用神经网络研究工时变化规律的通用化计算机辅助工时定额系统,在此基础上探讨了工时的分类划分,阐明了系统的体系结构和功能模块,最后介绍了系统的应用流程。
3)  Man-hour ration
工时定额
1.
Standard parameter database of man-hour calculation is set up and an applied software of man-hour ration management system is developed by integrating the application of mathematic model and computer query,taking Delphi and Access as develop tool,and ODBC as database interface.
采用数学模型与计算机查表综合应用的方法,以Delphi和Access数据库作为开发工具,ODBC为数据库接口,建立了工时计算标准参数数据库,开发出了实用的工时定额管理软件。
2.
The quality of man-hour ration management influences working-time, using ratio of equipment, cycle of production and reward, etc.
工时定额管理是企业的一项重要基础管理,是企业计划管理、经济核算、生产进度调控、成本控制、产品报价的重要依据,也是促进企业劳动生产率提高的重要手段。
4)  time quota
工时定额
1.
Research on Ration Predetermining Model in Computer Aided Time Quota Ration System Based on Primitives;
计算机辅助工时定额系统中的定额测算模型研究
2.
Study and Development on the Time Quota Module for Injection Mould CAPP System;
注塑模具CAPP系统工时定额模块的研究与开发
3.
Study and Development of Computer Aided System for Time Quota Management System Based on MODAPTS;
基于MODAPTS的计算机辅助工时定额管理系统研究与开发
5)  Standard time
工时定额
1.
In the current enterprises the Standard Time of the procedure is calculated manually, and influenced by man-made factors, enterprise information integration and sharing of resources is achieved difficultly.
针对当前企业中工时定额通过手工制定,人为因素影响比较大,无法实现企业资源共享和信息集成的问题,分析了影响工时定额的主要因素以及工时定额制定的工艺特点,研究了工艺标准化技术、工时定额的制定技术以及工时定额合理性验证技术等关键技术,讨论了基于Web Service协同工时定额系统,提出了基于工艺标准化的工时定额制定技术。
2.
The enterprise named Z is a OKP (one-of-a-kind production) manufactures enterprise, which is required to make its product process and standard time quickly and exactly.
工时定额是安排作业计划、进行成本核算、确定设备数量、人员编制以及规划生产面积的重要依据。
6)  hour norm
工时定额
1.
Design and Research of Intelligent Computer Aided Management System of Hour Norm;
工时定额智能规划系统的设计与研究
补充资料:城市总体规划与国土规划、区域规划的关系

国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条