1) initial cable shape
初始索形
2) cable initial deformation
索初始形变
1.
Considering its characteristics and from the viewpoint of cable initial deformation, the stiffness theory is established for this structure.
结合该结构体系的特点,从索初始形变的角度出发,建立了该结构的刚度法理论,并提出了预应力全过程分析的混合影响矩阵法、循环迭代逼近法、索初始形变"顺序分析法"以及索张拉力"顺序分析逆迭代法"等方法,形成该结构预应力全过程分析的完整理论,不仅适用于拱支预应力网架结构,也适用于其它类似的杂交空间结构。
3) initial cable force
初始索力
1.
According to the structural force characteristics and construction method of the cable-stayed bridge, the construction process thereof is simulated to study the impact of the initial cable force on the internal force of the structure and the alignment of the bridge.
根据斜拉桥结构的受力特性和施工方案,模拟了斜拉桥建造过程,研究了初始索力对结构内力和桥梁线形的影响。
2.
Determination of initial cable forces under dead load is an important and hard task during the design of cable-stayed bridges.
)斜拉桥时 ,确定成桥恒载初始索力值是一项重要而困难的任务 ,为此尝试用遗传算法来确定不同目标状态下的斜拉桥初始索力 。
3.
The initial cable forces can be well determined.
建立的方法对大跨度斜拉桥进行几何非线性分析具有较高的计算精度,同时能够合理确定斜拉桥初始索力。
4) initial deformation
初始变形
1.
Effect of the random initial deformation on loading capacity of derrick;
任意初始变形对井架承载的影响
5) ground conth
初始辊形
6) initial configuration
初始位形
1.
Starting with special jets,we analyze the asymmetry between initial configuration of two incoming streams and their interaction.
以平面二维不等厚度来流碰撞为例,给出了非对称射流出流方向、厚度随初始位形变化的理论预测曲线,与数值模拟结果吻合较好。
2.
In this paper,it is the first time via actual workspace analysis to propose a simple obstacle-avoidance approach based on initial configuration planning of the backbone curve for hyper-redundant robot.
首次通过对基于脊线表达的平面超冗余度机器人机构的实际工作空间的分析,提出了一种简单的基于脊线初始位形规划的避障方法。
补充资料:J形及L形密封
分子式:
CAS号:
性质:两种均为唇形橡胶密封,截面形状分别为J形和L形。多为纯橡胶制品,也有少数是夹布制品。根据使用条件,一般用天然橡胶或丁腈橡胶制造。结构较简单,摩擦力低,专用于气压或液压机械设备的活塞及活塞杆密封,工作压力在1MPa以下,如用于汽车和火车制动系统及离合器操纵系统中,起传递压力和密封的作用。
CAS号:
性质:两种均为唇形橡胶密封,截面形状分别为J形和L形。多为纯橡胶制品,也有少数是夹布制品。根据使用条件,一般用天然橡胶或丁腈橡胶制造。结构较简单,摩擦力低,专用于气压或液压机械设备的活塞及活塞杆密封,工作压力在1MPa以下,如用于汽车和火车制动系统及离合器操纵系统中,起传递压力和密封的作用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条