说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 初始恒载索力
1)  Initial cable forces
初始恒载索力
2)  initial cable force
初始索力
1.
According to the structural force characteristics and construction method of the cable-stayed bridge, the construction process thereof is simulated to study the impact of the initial cable force on the internal force of the structure and the alignment of the bridge.
根据斜拉桥结构的受力特性和施工方案,模拟了斜拉桥建造过程,研究了初始索力对结构内力和桥梁线形的影响。
2.
Determination of initial cable forces under dead load is an important and hard task during the design of cable-stayed bridges.
)斜拉桥时 ,确定成桥恒载初始索力值是一项重要而困难的任务 ,为此尝试用遗传算法来确定不同目标状态下的斜拉桥初始索力 。
3.
The initial cable forces can be well determined.
建立的方法对大跨度斜拉桥进行几何非线性分析具有较高的计算精度,同时能够合理确定斜拉桥初始索力。
3)  cable tension underpermanentloads
恒载索力
4)  the initial cable force
拉索初始张拉力
1.
Then trial method based on the forward analysis is used to determine the initial cable force of Xinyan cable-stayed bridge in the paper.
然后采用基于正装分析的试算法,确定了新园斜拉桥的拉索初始张拉力,最后本文还利用影响矩阵法进行了成桥后索力的调整计算。
5)  initial star
初始恒星
6)  Reasonable cables dead loading
恒载合理索力
补充资料:恒载
      见荷载。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条