1) Tiger Leaping Gorge hydroelect
上虎跳峡水电站
2) Hutiaoxia Hydroelectric Project
虎跳峡水电站
1.
Strategic significance of development and construction of Hutiaoxia Hydroelectric Project on Jinsha River;
金沙江虎跳峡水电站开发建设的战略意义
4) Hutiaoxia hydropower project
虎跳峡水利枢纽
1.
Hutiaoxia hydropower project to be constructed is a key one on the Shigu Yibin stretch of the Jinsha river and is located in a well known frequent strong earthquake zone from Zhongdian to Dali in South west China.
拟建的虎跳峡水利枢纽工程是金沙江石鼓—宜宾河段的关键性枢纽工程 ,地处我国西南部地区著名的中甸—大理强震频繁带 ,近场区主要断裂构造有 5组。
5) Tiger-Leaping Gorge
虎跳峡
1.
The stability of the right bank slope of Longpan in Tiger-Leaping Gorge area is important to the building of the Tiger-Leaping Gorge reservoir.
虎跳峡龙蟠右岸边坡的稳定性问题对拟建的虎跳峡水电站具有重要的意义。
2.
Several horizontal push-shear in-situ tests on SRM in an immersion state under water were carried at Long pan slope in Tiger-Leaping Gorge,and some significant conclusions were drawn.
以虎跳峡龙蟠右岸地区分布的土石混合体为依托,对土石混合体在浸水条件下的力学响应进行了大型原位水平推剪试验,取得一些成果。
3.
In order to make more study on the distortion and destruction characters of the rock-soil aggregate,six test sites on the right bank of Longpan in Tiger-leaping Gorge reservoir area are selected.
为进一步研究土石混合体的变形破坏特征,对虎跳峡龙蟠右岸地区分布的土石混合体选取6个试验点分别进行了天然状态下(3个)和浸水条件下(3个)的原位大型水平推剪试验,取得一些有意义的研究成果。
6) Three Gorges Hydropower Station
三峡水电站
1.
Principles and Operation Condition of Reactive Power Regulation of Generating Units at Three Gorges Hydropower Station;
三峡水电站机组无功调节原理及其运行情况分析
2.
Measurement Analysis and Practice of Insulation of Generator Stator Windings on Three Gorges Hydropower Station;
三峡水电站发电机定子绕组绝缘测量分析与实践
3.
Analysis on Vibration Test in Site for Unit of Three Gorges Hydropower Station;
三峡水电站机组现场振动测试分析
补充资料:丽江虎跳峡
虎跳峡,又称“金沙劈流”,位于丽江玉龙雪山与哈巴雪山之间,全长15千米,从江西到山顶高差达3千多米,是世界上最深的大峡谷。共分上虎跳、中虎跳和下虎跳等三部分。两岸均如刀削斧砍,陡峭险绝。谷底狭窄,最窄处仅有30余米。传说有虎能一跃而过,因而得名。揣急的江 水,如万马奔腾,夺路而出,流速达每秒6-8米。峡内涛声如雷,浪花飞溅,惊心动魄,险峻奇绝,是探险旅游的好去处。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。