2) Adjustment test to achi eve optimization
寻优调整试验
3) adjustment test
调整试验
1.
The influence of burners on safety and economics of boilers are known after the combustion adjustment tests and burner tilting tests for 2 100 t/h boilers in Shajiao C Power Station,which is referable for guiding the safe and economic operation of boilers.
对沙角C电厂2 100 t/h 锅炉进行燃烧调整试验和燃烧器的摆动试验后, 掌握了燃烧器对锅炉安全和经济性的影响, 这对指导锅炉安全经济运行有一定的参考价值。
2.
The orthogonal experimental method was adopted during adjustment test,the main and secondary sequence effected on spicific output and coal fineness of coal pulverizing system were determined and the optimum operation mode of pulverizers on coal pulverizing system was forecasted.
对其运行方式进行优化,在调整试验中采用正交试验法,确定出影响制粉系统单耗、煤粉细度各个因素的主次顺序,预测磨煤机制粉系统最佳运行方式,根据校核试验的结果,确定了制粉系统磨煤机的最佳运行方式为挡板开度60%,加载力偏置-2。
4) commissioning test
调整试验
1.
The main technical specifications,characteristics and commissioning tests before put into use of HG-1950/25.
4-YM1型燃煤超临界锅炉主要技术规范、技术特点和试运前的调整试验。
6) Optimization adjustment
优化调整
1.
Study on industrial structure optimization adjustment in Dongting Lake area;
洞庭湖区产业结构优化调整的研究
2.
Apportioning uniformity of pulverized coal flow among the conveying pipes was improved by optimization adjustment and segregation baffle opening variations,performed on single as well as on whole sets of mills.
根据中速磨煤机优化调整的试验数据,探讨了输粉管煤粉分配的均匀性和煤粉细度的变化规律。
3.
On the basis of investigation and analysis of Yingjing county agricultural resource and actuality evaluation, a system dynamic model about the optimization adjustment of agricultural production structure of Yingjing county is established with system dynamic theory, and a dynamic simulation for the Yingjing agricultural production structure adjustment has been done on the computer.
在实地调查分析荥经县农业资源和农业生产现状诊断的基础上,应用系统动力学理论建立了荥经县农业生产结构优化调整的SD模型,并在计算机上实现了农业生产结构调整的动态仿真。
补充资料:静电除尘器调整试验
静电除尘器调整试验
commissioning test of electrostatic precipitator
J一ngd一an ehuehenq一t一oozheng sh.yon静电除尘器调挂试验(eommissioning test。feleetrostatie preeipitator)对静电除尘器进行电气设备交接试验、空载升压试验、振打装置振打试脸、气流均布试验、试运行及除尘效率测定等,使其性能指标合格能正常投人运行所进行的工作。 电气设备交接试验主要有整流变压器及电抗器的绝缘试验;电力电垅直流耐压试验;瓷瓶、振打轴及瓷套筒等的绝缘耐压试验;二次回路通电操作试验;整流、触发回路的特性试验。 空载升压试验即极板间介质为空气时的升压试脸。目的是检查极板施工质量。先在每一电场的电极系统(放电极和收尘极)安装结束后进行,电压升至规定值不击穿为合格。当一台整流变压器容量不够时,可用两台并联加压,升压过程中若发生击穿,应检查处理,处理时要注意安全,应先将高压电源侧接地后始可进入极板区。各电场全部安装结束后需总体再进行一次空载升压试验。 振打装里振打试验内容除检查电气回路的联动情况、电动机转向、时间整定、振打一个周期的程序符合要求外,尚需到除尘器室内观察振打锤与撞击头的接触位工是否正确,若不合适应进行调整。振打试验时间不小于3h,振打后检查各部件的紧固螺栓有无松动。 气流均布试验即通过除尘器的气体流速分布试验。在最后一层分布板之后约500 mm处共设100~120个测点(纵行、横行测点间距离约lm)。测得数据按均方根值法进行计算,要求气流不均匀系数不大于。.2。若局部气体流速偏高或偏低,可将分布板上相应的孔径缩小或扩大加以解决。试验在锅炉空气动力场试验前后进行。 试运行试验项目有:①排灰装置投人试运行;②振打装t投人试运行;③锅炉点火前24h投人各电加热器加热瓷套,并检查各灰斗的蒸汽加热装置的工作情况;④侧定各电场的空载伏安特性,电压每升高2kV停留105测得相应的电流值,所得特性曲线作为日后运行检修的原始数据;⑤除尘器室通人烟气后再次记录各电压、电流值以测定各电场的负载特性,⑥调节火花频率数。 在试运过程中,当灰斗内集灰过多未及时排除时,将使除尘器放电电压值降低,甚至极间短路,电源开关跳闸,此时应及时清灰,排除故障。 除尘效率测定在锅炉移交生产后进行。(见除尘器性能试脸)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条