1.
Test and adjustment of blast operation mode for sewage treatment facility
污水处理设施鼓风运行方式的试验调整
2.
bench adjustment
机架调整,试验台上调整
3.
motor-testing and regulating apparatus
发动机试验和调整仪
4.
Function test and adjust error for log on sea trial.
航行试验中计程仪效用试验及误差调整。
5.
ORTHOGONAL TEST METHOD AND ITS APPLICATION IN COMBUSTION ADJUSTING TEST OF CFB BOILERS
正交试验方法在CFB锅炉燃烧调整试验中的应用
6.
Regulation Testing Research of Combustion on 500MW Boiler;
500MW锅炉机组燃烧调整试验研究
7.
Studies on reform of boiler burner and burning adjustment test;
锅炉燃烧器改造及燃烧调整试验研究
8.
Study on Combustion Adjustment of 600MW Supercritical Pressure Boiler
600MW超临界机组锅炉燃烧调整试验研究
9.
Combustion Adjustment and Optimization of a 1025t/h Boiler
1025t/h锅炉燃烧调整试验及优化运行
10.
DEH Valve Commissioning for SIEMENS 1 000 MW Steam Turbine
西门子1000MW机组DEH汽门调整试验
11.
Test of co-whole system
整架调试(整机联试)
12.
Application of Orthogonal Experimental Method on Medium Speed Pulverizer Adjustment Test
正交试验法在中速磨煤机制粉系统调整试验中的应用
13.
Charging test and safety valve and automatic device adjusting for main compressor( auxiliary compressor).
主()气压缩机的充气试验、全阀和自动装置的调整。
14.
Impact of Latent Heat on the Precipitation Function of Mei-Yu Systems──a Numerical Study
潜热对梅雨系统降水功能的调整──数值试验研究
15.
The Mathematical Statistic Analysis of Experiments on Structural Parameters Selection of Combustion Chambers
燃烧室结构参数调整试验的数理统计分析
16.
Experimental Analysis on Combustion Adjustment and Optimal Operation of 220t/h Boiler;
220t/h锅炉燃烧调整试验分析及优化运行
17.
The Analysis of Current Status and Adjustment Strategy for Science and Technology Financial Investment in Bijie Prefecture;
毕节试验区财政科技投入现状分析与调整策略
18.
Coordinating Test for Combustion Optimization of Boiler No.1 in India Yamunanagar Power Plant
印度雅慕那电厂1号锅炉的燃烧优化调整试验