说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 洪江水电站
1)  Hongjiang hydropower station
洪江水电站
2)  Wujiang Hongjiadu Hydropower Station
乌江洪家渡水电站
1.
The excavated side height at the left abutment of Wujiang Hongjiadu Hydropower Station is 310 m, the highest one in water conservancy and hydropower construction history of China.
乌江洪家渡水电站左坝肩高边坡开挖高度 310m ,是中国水利水电工程史上开挖最高的边坡 ,该边坡的稳定问题众所瞩目 ,文章采用弹塑性有限元数值模拟方法对左坝肩高边坡施工期岩体应力应变状态进行分析研究 ,从而对左坝肩高边坡的稳定性进行评
3)  Hongkou hydropower station
洪口水电站
1.
Application of new technology of lean cemented aggregate in Hongkou Hydropower Station construction;
贫胶粗粒料筑坝新技术在洪口水电站的设计与实施
2.
Based on the scheduled construction progress of the RCC dam in Hongkou hydropower station,numerical simulation is used to simulate and calculate temperature field and stress field during construction and operation stages of the RCC dam.
根据洪口水电站碾压混凝土大坝的施工进度,进行了大坝施工期和运行期的温度场和应力场的仿真计算,讨论了坝体设置诱导缝和永久横缝的优劣,分析可能产生裂缝的原因及提出相应的温控防裂措施。
4)  Liuhong Hydropower Station
柳洪水电站
1.
Inquiring into sediment flushing measures and operating mode of Liuhong Hydropower Station;
对柳洪水电站泄洪冲沙措施及运行方式的探讨
2.
Discussion on stability treatment method for accumulation body on left bank of reservoir for Liuhong Hydropower Station;
柳洪水电站库区左岸堆积体稳定处理方法探讨
3.
The Research and Practice of Excavation Construction Technology for Long Inclined-shaft of Liuhong Hydropower Station;
柳洪水电站长斜井开挖施工技术研究与实践
5)  Jinghong Hydropower Station
景洪水电站
1.
Primary Electrical Design for Jinghong Hydropower Station;
景洪水电站电气一次设计
2.
Field Processing of the Turbine s Stay Ring for Jinghong Hydropower Station;
景洪水电站水轮机座环现场加工
3.
The Field Manufacturing of Turbine Runner for Jinghong Hydropower Station;
景洪水电站水轮机转轮的现场制作
6)  Hongmen hydropower station
洪门水电站
1.
Treatment for cracks on piers of the spillway at Hongmen hydropower station;
洪门水电站溢洪道闸墩裂缝处理
2.
Sludge from drain hole of drainage gallery at the spillway foundation of Hongmen hydropower station;
洪门水电站溢洪道基础排水廊道排水孔析出物分析
3.
This paper analysed the measured data by piezometer tubes at the main dam foundation fault F11 of Hongmen hydropower station in aspects such as water level, gradient, potential, rope kit picture and so on, which indicated that the effect of anti-seepage curtain was declined, the F11 fault had been in erosion and its operation performance was deteriorated gradually.
对洪门水电站主坝坝基F11断层测压管资料从水位、坡降、位势、绳套图等方面进行了分析,结果表明帷幕防渗作用在减退,F11断层已受到冲蚀,运行性态正在逐步恶化,并提出应尽早进行补强灌浆的处理措施,保障大坝安全运行。
补充资料:东江水电站
      中国80年代湖南省内最大的水电站(见彩图)。装机容量50万kW,并兼有防洪、航运、养殖和工业供水等综合效益。位于资兴县罗霄山脉西麓湘江支流耒水上,距资兴市10km。坝址上游控制流域面积4719km2,多年平均流量144 m3/s。上游盛产木材,有钨、铁矿藏。河谷呈"V"形,两岸山势雄伟,植被茂密。基岩为坚硬致密的花岗岩,地质构造简单,是一优良水电开发地址。
  
  电站枢纽主要由混凝土双曲拱坝、两岸潜孔滑雪式溢洪道各一座、左岸放空兼泄洪洞一条、右岸泄洪洞一条、过木道一条和坝后式厂房等组成。坝高157m,是20世纪80年代中国大陆上最高的混凝土双曲薄拱坝。坝内装设有自动安全监测系统。它的建成标志中国拱坝建设进入成熟时期。
  
  水库正常蓄水位285m,总库容81.2亿m3,具有多年调节性能。泄洪建筑物采用较新颖的窄缝挑流消能方式。发电厂房位于坝下游,长106m、宽23m、高55.1m,安装单机容量12.5万kW水轮机组4台,总装机50万kW,是耒水干流上13个梯级水电站中库容和装机容量最大的主导电站。电站担负华中电网中补偿调节及调峰,对提高电网的质量有重要的作用;联合运行时,保证出力提高至30万kW。水库的调蓄功能在一般年份可免除下游3.0万亩农田的洪涝灾害,并使京广铁路灶市段的防洪标准提高至100年一遇水平;库区回水长160km,可发展航运。下游9km峡谷出口处建有小东江水电站,形成反调节水库,可保证泄放不小于30m3/s的流量时,下游永兴至耒阳段的航运得到改善。
  
  工程于1958年10月开工,1961年停建,1978年3月复工,1987年10月第一台机组发电,1989年全部机组投入运行。施工中,导流隧洞掘进曾采用光面爆破,坝基开挖曾采用三面预裂爆破等新技术。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条