1.
Application of MB+ in the auxiliary communication network of Liuhong hydropower station
MB+在柳洪水电站辅机通信网络中的应用
2.
The Construction Method Proposal Study on the Excavation and Supporting & Protection Works for Powerhouse of Liuhong Hydropower Station;
柳洪电站主副厂房开挖与支护施工方案研究
3.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
4.
The Machining Technology of Runner at Site of Jinghong Hydropower Station
景洪水电站水轮机转轮工地加工技术
5.
Installation of guidevane mechanism of hydro-turbines of Liushuping Hydropower Station
柳树坪水电站水轮机导水机构安装调整
6.
The Hydraulic Model Test on Outlet Works and Energy Dissipation for Chardara Hydropower Station;
Chardara水电站泄洪消能模型试验研究
7.
Study on Engineering Project Financial Management of Hongjiadu Hydropower Station;
洪家渡水电站工程项目财务管理探讨
8.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
9.
Tests and research on aeration and corrosion reduction for spillway of Bakun hydropower station
巴贡水电站溢洪道掺气减蚀试验研究
10.
Rock slide treatment for spillway tunnel of Chahanwusu Hydropower Station
察汗乌苏水电站溢洪洞洞室塌方处理
11.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
12.
Study of Water Yield Prediction in the Underground Power House of Hong Ping Pumped Storage Station;
洪屏抽水蓄能电站地下厂房涌水量预测研究
13.
Real Time Flood Forecast and Regulation System in Baiyun Reservoir;
白云水电站实时洪水预报调度系统研究
14.
Hydropower Reservoir Flood Optimal Scheduling Model Pragmatic Approach;
水电站水库防洪优化调度的模型与方法
15.
Study on Hydraulic Model Test of the Left Spillway in Miaojiaba Hydropower Station
苗家坝水电站左岸溢洪道水力模型试验研究
16.
Discussion on energy dissipation design for hydropower station at high head and large discharge
大流量高水头水电站泄洪消能设计的探讨
17.
EXPERIMENTAL STUDY ON SHAFT SPILLWAY HYDRAULIC CHARACTERISTICS OF DA SHI MEN HYDROPOWER
大石门水电站竖井式溢洪道水力特性试验研究
18.
Design of anti-seepage drainage system of underground powerhouse for Hongping pumped storage power station
洪屏抽水蓄能电站地下厂房防渗排水系统设计