说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 洪口水电站
1.
Engineering Geological Research of Weathered Rocks of Hongkou Hydropower Station Dam Site and the Reasonable Optimization of Dam Foundation Surface;
洪口水电站坝址区风化岩体工程地质研究及建基面的合理优化
2.
Study on the Method of Real-time Flood Forecast for Sujiahekou Hydropower Project
苏家河口水电站洪水实时预报方法研究
3.
Evaluation on slope stability of a hydroelectric station spillway,Lancang River
澜沧江某水电站泄洪洞出口边坡稳定性评价
4.
Analysis of the Stability of the Slope of the Outlet Section of Spillway Tunnel of Luding Hydropower Station;
泸定水电站右岸泄洪洞出口边坡稳定性研究
5.
Experimental Study on Scheme of Energy Dissipation of Discharge Structures of Laodukou Hydropower Station
老渡口水电站泄洪消能方案模型试验研究
6.
Experimental Study on Optimum Floodway′s Bodily Form of Guanmaozhou Hydroelectric Station
官帽舟水电站泄洪洞出口形式优化试验研究
7.
Seepage Calculation and Stability Analysis of Outlet Slope for Lianghekou Hydropower Station
两河口水电站泄洪出口边坡渗流及稳定性计算分析
8.
Study on Stability of Tunnel-Face Slope for Intake of Right-Bank Jinping Ⅰ Hydropower Station
锦屏一级水电站泄洪洞进水口洞脸边坡稳定性研究
9.
The Stability Analysis of High-rock Slope on the Right Bank Spillway Tunnel of Luding Hydroelectric Station;
泸定水电站右岸泄洪洞出口边坡稳定性数值分析
10.
Study on the Stability of Spillway Slope in Hemenkou Dam of Wudongde Ydroelectric Power Station in Jinsha River;
金沙江乌东德水电站河门口坝址溢洪道边坡稳定性研究
11.
Deformation and Stability Analysis of Outlet Section of the Discharge Tunnel of Pubuguo Hydropower Station;
瀑布沟水电站泄洪洞出口段开挖变形及稳定性非线性有限元分析
12.
Construction Techniques of The First Stage Open Excavation at Spillway Tunnel Outlet in Left Bank of Xiluodu Dam
溪洛渡水电站左岸泄洪洞出口一期明挖施工技术
13.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
14.
The Machining Technology of Runner at Site of Jinghong Hydropower Station
景洪水电站水轮机转轮工地加工技术
15.
The Hydraulic Model Test on Outlet Works and Energy Dissipation for Chardara Hydropower Station;
Chardara水电站泄洪消能模型试验研究
16.
Study on Engineering Project Financial Management of Hongjiadu Hydropower Station;
洪家渡水电站工程项目财务管理探讨
17.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
18.
Tests and research on aeration and corrosion reduction for spillway of Bakun hydropower station
巴贡水电站溢洪道掺气减蚀试验研究