说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 曲线段施工
1)  tunnel boring on curved section
曲线段施工
2)  operation curves
施工曲线
1.
This paper presents the concept to use productivity model to analyze acidizing effect and discusses a comprehensive evaluation method for acidizing effect which is integrated with operation curves,production history curves,well test interpretation and productivity model analysis.
提出用产能理论模型分析酸化效果,并探讨了集成施工曲线分析、采油曲线分析、试井解释分析和产能理论模型分析的酸化效果综合评价方法。
3)  hydraulic fracture operating curve
压裂施工曲线
4)  construction stage
施工阶段
1.
How to do well the supervision work in the engineering construction stage;
浅析如何做好工程施工阶段的监理工作
2.
Engineering cost control in the construction stage of the construction project;
建设项目施工阶段工程造价控制
3.
Discussion on the project cost control in construction stage;
浅谈施工阶段项目的成本控制
5)  construction phase
施工阶段
1.
Reorganizing method of engineering supervision data in construction phase;
谈施工阶段工程监理资料的整编方法
2.
Analysis on effective cost control measures in design and construction phases;
浅析设计和施工阶段造价的有效控制
3.
Study on announcement system at construction phase;
浅议工程施工阶段的公示制度
6)  constructing stage
施工阶段
1.
Research on the cost management of constructing stage in construction project;
浅谈项目施工阶段的造价控制
2.
Discussion on cost management of constructing stage in construction project;
谈建筑工程施工阶段的造价管理
3.
Cost control of constructing stage during construction items executing process;
浅谈建设项目实施过程中施工阶段造价控制
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条