说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 0#段施工
1)  Construction Technology of №0 Segment
0#段施工
1.
The Construction Technology of №0 Segment of LuZhou Rigid Frame Bridge Over Yangtze River;
泸州长江大桥连续刚构0#段施工技术
2)  section zero
0~#段
3)  construction stage
施工阶段
1.
How to do well the supervision work in the engineering construction stage;
浅析如何做好工程施工阶段的监理工作
2.
Engineering cost control in the construction stage of the construction project;
建设项目施工阶段工程造价控制
3.
Discussion on the project cost control in construction stage;
浅谈施工阶段项目的成本控制
4)  construction phase
施工阶段
1.
Reorganizing method of engineering supervision data in construction phase;
谈施工阶段工程监理资料的整编方法
2.
Analysis on effective cost control measures in design and construction phases;
浅析设计和施工阶段造价的有效控制
3.
Study on announcement system at construction phase;
浅议工程施工阶段的公示制度
5)  constructing stage
施工阶段
1.
Research on the cost management of constructing stage in construction project;
浅谈项目施工阶段的造价控制
2.
Discussion on cost management of constructing stage in construction project;
谈建筑工程施工阶段的造价管理
3.
Cost control of constructing stage during construction items executing process;
浅谈建设项目实施过程中施工阶段造价控制
6)  construction period
施工阶段
1.
Supervision on investment control in construction period of Xiaowan hydropower project
小湾水电站施工阶段监理投资控制工作
2.
Stress monitoring analysis in the construction period of the continuous beam bridge cantilever
连续梁桥悬臂施工阶段的应力监测分析
3.
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条