2) fine silty layer
粉细砂土层
3) sand silt ground
砂质粉土层
1.
C4-3-9 block of Hangzhou Economic and Technological Development Zone locates in sand silt ground,and it is retained with technology of I-shaped prefabricated reinforced concrete pile implanted soil-cement.
杭州经济技术开发区C4-3-9地块处于砂质粉土层,采用水泥搅拌土植入工形预制钢筋混凝土桩围护,即沿基坑一周先打设水泥搅拌桩,紧跟植入工形桩,同时施工支撑桩;放坡开挖,喷射混凝土护面,浇筑压顶梁;继续开挖并施工围檩梁与支撑;再开挖至坑底,完成坑中坑围护、钢筋绑扎和底板浇筑。
4) Shallow sandy soil and silty soil
浅层砂土、粉土
5) saturated fine silty sand ground
饱和粉细砂土层
6) saturated sandy loam
饱水粉砂土层
补充资料:高炉喷煤粉设施多层钢框架(上海宝山钢铁总厂3号高炉)
高炉喷煤粉设施多层钢框架(上海宝山钢铁总厂3号高炉)
熬 高炉喷煤粉设施多层钢框架(上海宝山钢铁总厂3号高炉)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条