说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 丹江口初期工程
1)  first-phase project of Danjiangkou Hydraulic Project
丹江口初期工程
2)  Danjiangkou Project
丹江口工程
3)  Danjiangkou Water Transfer Project
丹江口调水工程
1.
Effect of Danjiangkou Water Transfer Project on Shaanxi and regional economy and its countermeasures;
丹江口调水工程对陕西及区域经济发展的影响与对策
4)  Danjiangkou Dam heightening project
丹江口大坝加高工程
1.
The paper discusses the technology requirement,construction programs,methods and quality control measures on construction of jointing old and new concrete in Danjiangkou dam heightening project of Middle Line of the South-to-North Water Transfer Project.
论述了南水北调中线水源工程丹江口大坝加高工程贴坡新老混凝土结合施工的技术要求、施工程序、施工方法及质量控制措施等。
2.
In dam base widening excavation construction of left bank of Danjiangkou dam heightening project, it is essential not to produce crack by blasting in old dam body to ensure dam safety, especially to ensure normal operation plant and other equipments.
在丹江口大坝加高工程左岸坝段扩大基础开挖施工中,除了要防止老坝体混凝土因爆破产生裂缝外,还要保证大坝的安全运行,特别是电厂及相关设备的正常运行,因此采用了控制爆破施工技术,并加强了对爆破过程中的安全监测和立体安全防护工作,取得了较好的效果。
5)  first-phase project
初期工程
1.
The comprehensive development planning of Danjiangkou Hydraulic Project,general layout of the first-phase project and the main hydraulic structures are described;the second-phase dam heightening works and the major social-economic benefits of Danjiangkou Hydraulic Project are described emphatically.
介绍了丹江口水利枢纽的开发规划初期工程的枢纽布置及主要建筑物;重点介绍了续建计划中的大坝加高工程及水利枢纽主要的社会经济效益。
6)  the lst phase regulation project of the Yangtze Estuary
长江口一期治理工程
补充资料:江口
【诗文】:
六朝文物草连空,今古无端入望中。
江上晚来堪画处,参差烟树五湖东。



【注释】:



【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条